The days have passed silently in the blink of an eye. In the past year, we have gained a little through hard work. It is better to make a summary to analyze and draw lessons from our past work. Presumably, many people are worried about how to write a good year-end summary. The following are five essays on personal annual work summary of chemical industry in 222, which I collected for you. Welcome to read, I hope you will like them.

Personal Annual Work Summary of Chemical Industry in 222 Model essay 1

Completion of work objectives in the first and second years:

As a new employee who just entered the workshop in January of _ _ _ _, during the first half of this year, I first got a comprehensive understanding of gasification devices. Through long-term training and on-site study, I was able to apply theoretical knowledge to actual production and get familiar with the use and performance of on-site equipment.

2. Problems and improvement direction:

The existing problems are:

1. The detailed structure of some equipment is unclear;

2. Lack of knowledge of electrical instruments;

3. Lack of experience in production and operation;

4. Some accidents are unclear;

improvement direction:

1. study hard in equipment to improve the understanding of equipment;

2. Make use of your spare time to learn more from electrical instrument personnel;

3. Learn and consolidate the knowledge of process production;

4. Be good at summing up accident experience;

III. Work Experience of _ _ Year

The tense _ _ year is drawing to a close. During the past half year, I have learned a lot that I couldn't learn in previous textbooks, and truly realized that the chemical industry is a continuous industry with harsh production conditions and high technical requirements.

in this materialistic era, only by mastering more scientific and technological knowledge can you have your own foothold. We should make progress and strive for our vested interests, and we should not go with the flow and fish in troubled waters. In my usual work, I constantly sum up my experience, study hard on the spot, often ask the master for advice, improve my production skills, be good at summing up accident experience and constantly improve my production operation technology. In short, all my abilities have been greatly improved in the past six months. Of course, there are still many shortcomings. The production of chemical enterprises is complicated and it is impossible to cover everything. Therefore, there are still many problems to be solved in the future work, which requires us not to relax, keep a positive learning attitude and constantly improve our comprehensive ability.

everyone has their own responsibilities and obligations on different occasions, and as an employee of Guanghui New Energy, our responsibility is to do our own job well, ensure the sound and rapid development of production, make the equipment work to the maximum efficiency, and strive to create the greatest benefits for the company, so that the company will have greater ability to meet our needs and meet our requirements for living standards and all aspects. Therefore, as long as everyone can bear their own responsibilities and obligations, then the company can continue to produce and produce safely, so that the company can get the maximum benefit and the interests of each employee can be guaranteed. This will be of great benefit to society, the company and employees, and Guanghui New Energy Company can have a better development.

4. Work plan for _ _ years

1. Adapt to the post as soon as possible, satisfy the leaders and reassure colleagues.

2. Do your job well, change your attitude, and be neither arrogant nor impetuous.

3. Strive to assist the team to complete the company's indicators.

4. Obey the arrangement of the superior, and earnestly complete the work assigned by the workshop team.

5. Learn more and sum up experience to improve your comprehensive level.

6. Establish safety awareness and solve potential safety hazards.

Summary of Personal Annual Work in Chemical Industry in 222

Since I graduated from work in _ _ _ _ _, I have gradually grown from a naive student to a qualified technician. After several years of on-site practical work, I have summed up a set of construction procedures suitable for myself and various projects. Over the past few years, I have been engaged in the catalytic cracking project of 1 million tons/year waxing, the capacity expansion and reconstruction project of 2, tons/year calcium carbide plant in silicone, the expansion project of 1, tons/year butyl zinc alcohol in fertilizer plant, the relocation and reconstruction project of three units in refinery, and the capacity expansion and reconstruction project of No.2 distillation in petrochemical company. There are 12 projects, such as 1, tons/year ethylene technical renovation project, 15, tons/year polyethylene technical renovation project, 1.4 million tons/year catalytic cracking technical renovation project of _ _ _ refinery, first distillation capacity expansion project of _ _ petrochemical company, and 1 million tons/year delayed coking project of _ _ refinery. In the above projects, I was in charge of technical management, and I have been conscientious and meticulous in my work. I have always pursued scientific management and strict requirements on construction quality, which ensured that the qualification rate of construction was 1%, and some projects have won national high-quality projects.

from _ _ to _ _ _, I was engaged in the construction management work in the technical transformation project of tapping the potential of 1, tons/year ethylene plant, the technical transformation project of tapping the potential of 15, tons/year polyethylene plant, the technical transformation project of 1.4 million tons/year catalytic cracking refinery and the capacity expansion project of Dalian Petrochemical Company. During these constructions, I strengthened the quality management, cost management and capacity expansion.

in terms of quality management, I take strengthening the management of lifelong responsibility system for quality, clarifying responsibilities and strengthening the management responsibility card as the key points in the construction process, so as to ensure that the quality of each construction process is qualified, and at the same time, I will increase the daily management of quality, so that the construction of the next process can not be carried out if this process is unqualified, and ensure that every process is controlled. At the same time, the technical disclosure, scheme preparation and implementation supervision before the construction starts have been strengthened. Strict implementation of various standards in construction, strengthening process quality control, implementing quality wage system, high quality and good price have promoted the creation of excellent projects.

in terms of cost management, we should make a good cost forecast before construction, and implement dynamic monitoring management during construction, so that the project cost will always run under an orderly and controllable management system. In the actual construction, it is forbidden to rework in a large area on site, and reasonable materials are used to make use of the old and waste, so as to minimize the project investment. At the same time, the management of machines and tools is strengthened, regular inspections are carried out, maintenance is done well, comprehensive utilization rate is improved, and long-term operation is ensured.

in terms of project schedule management, in view of the tight project schedule, large amount of tasks and non-delivery of materials and equipment in recent years, in order to ensure that the construction tasks of control points are completed on time, I carefully organize, do a good job in construction preparation, and implement weekly plan management, so as to ensure the week by day and the month by week. Reasonable division of construction stages, the use of parallel flow construction method. In the 1.4 million tons/year catalytic cracking technical renovation project of Jihua Refinery and the first distillation capacity expansion project of Dalian Petrochemical Company, due to the tight construction period, the construction workload was greatly completed on schedule. At the beginning of the project, I suggested that the construction workers be familiar with the site situation and increase the prefabrication depth. These two projects are similar in scale, with 1,5 instrument valves and 1,2 welded pipe fittings installed in the whole plant, in order to reduce the workload during the peak construction period. Without restricting the normal construction of the instrument, I prefabricated the joints of the pressure gauge valve and the pressure guiding pipeline in advance in the construction preparation stage, laid the pressure guiding pipeline and the heat tracing pipeline to the accessories of the instrument primary point, and prepared the construction technology in advance, which created good conditions for the subsequent construction.

in terms of strengthening safety management, in view of the characteristics of long construction time, responsible site construction environment and frequent interchange operations, we will strengthen the safety management at the construction site, strengthen employees' awareness of self-protection, insist on giving priority to safety work, strengthen safety and fire prevention education for all employees, establish that everyone is in charge of safety, and implement the safety and fire prevention regulations, so as to ensure safety every day, implement safety every day and check safety every day.

summary of personal annual work in chemical industry in 222

Time flies quietly, and the year-end bell rings soon. It has been more than five years since I came to Qinghai Zhonghao Energy and Chemical Company. I have experienced the preliminary design of the device, infrastructure construction, start-up, trial production, safe production, maintenance, production process optimization, technical transformation, etc., and I have met many mentors and gained many valuable experiences and lessons. In this year, through our unremitting efforts, we have made some achievements in our work, but there are also many shortcomings. Looking back on the past year, the work is summarized as follows:

1. Work summary

1. Be fully responsible for the management of the General Engineer's Office and the technical work of the whole plant;

2. Strengthen supervision, inspection, guidance and assessment of production technology and technical indicators;

3. Preside over the process technology discussion meeting and process technology transformation meeting of the whole plant;

4. initially form the company's quality measurement, energy saving and standardized management system;

5. Establish and improve various technical ledgers and strengthen the standardized management of various technical documents;

6. Strengthen communication and coordination between departments' workshops to facilitate the smooth development of all kinds of work;

7. urge all workshops to strengthen staff training, which should be planned and persistent;

8. Write all kinds of operating procedures and technical improvement measures, update the technical transformation drawings, and modify and sort out the process operating procedures;

9. Do a good job in the company's external technical exchanges and production data reporting;

1, strengthen the improvement of their professional quality and accomplishment, such as obtaining a registered safety engineer certificate;

Second, feelings and experiences

1. Attitude determines everything. Only by being meticulous, conscientious, diligent, correct in attitude, and familiar with post business can we do a better job;

2. I should study my professional knowledge and think hard, constantly enrich my professional knowledge and skills, constantly improve my working methods and improve my work efficiency, especially in the technology-centered general office, which will make my work more handy;

3. Strengthen the communication between departments and workshops, actively integrate into the collective, handle all aspects of the relationship, strengthen the team consciousness of Zhonghao, unify thoughts and act in unison, so that our team will be invincible;

4. Be strict with yourself, be lenient with others, always ask yourself to proceed from reality, adhere to high standards and requirements, strive to improve the professional quality and moral quality in an all-round way, care for employees, and develop together to create a harmonious and happy Zhonghao family.

Third, there are shortcomings

1. The working method is not flexible, and I have done it alone, and I have not made full use of the functional resources of the departmental workshop. I have to distinguish between priorities, grasp the main contradictions, and draw a clear line. I have to think clearly about what is my job and what is the help I provide;

2. There is procrastination in doing things, and the pursuit of perfection is not necessarily the best. Considering the progress, quality and cost comprehensively, grasp the main contradictions, solve the main problems and make corrections at any time. Doing everything carefully often sticks to the details, and learning to be imperfect is also a progress in work and a requirement for fine chemical industry;

3. Lack of usual work summary. This year, progress has been made in work summary, but it is still not enough. If you look back and think about the right and wrong, gains and losses of your work every day, week and month, you will grow faster. In the future work, this item will also be taken as the key to improve myself;

Fourth, according to the summary and my own shortcomings, I put forward some requirements for myself:

1. Further strengthen the study of management knowledge, innovate working methods and improve work efficiency;

2, actively do a good job in departmental workshop coordination, and further clarify the relationship;

3. Continue to strengthen the technical strength of the General Engineer's Office, enhance technical capabilities, do a good job in production technical service management and supervise the training of employees;

4. actively improve yourself, strengthen the study of technical knowledge and improve the accuracy of technical analysis;

5, constantly exercise your courage and perseverance, improve the overall situation, improve the initiative of work, do things simply and decisively, and don't drag your feet;

6. Strengthen the summary of daily work, optimize working methods and improve work efficiency.

summary of personal annual work in chemical industry in 222

In a blink of an eye, _ _ years have passed. Looking back on my work in the past six months, I have gained a little through my own efforts. As the end of the year approaches, I feel it necessary to make a summary of my work. The purpose is to learn lessons and improve myself, so that I can do my work better, and I have the confidence and determination to do my future work better. The following is a summary of my work over the past few months.

when I first entered the company, I entered the ammonium phosphate plant. As a layman who is not a chemical professional, I studied chemical technology hard, went down to the workshop to learn about various jobs and communicated with production workers wholeheartedly. Have a certain understanding of the company's corporate culture and operating mechanism. At the same time, during this period, I have a certain understanding of the company's equipment, products, processing flow and so on. This laid a certain foundation for my later craft work.

My work includes the following aspects:

First, in the aspect of safety production management,

I will continue to adhere to the policy of "safety first, prevention first" and pay close attention to safety management. Fully implement the safety production responsibility system, focus on team management, strengthen the inspection of security team, improve the post responsibility system, manage in strict accordance with the safety operation procedures, report problems in time, and put an end to unsafe behaviors of employees; Make security risks nip in the bud. Organize and publicize the knowledge training on "safe production and fire safety" irregularly, publicize the relevant regulations of the company's safety management to the employees, improve their safety awareness, and be strict with themselves in safety management. Let employees know that production is safe, and then they can produce safely.

second, in terms of quality and production efficiency management,

seriously implement the production tasks assigned by the superior leaders, and at the same time pay close attention to cost-effectiveness, do a good job in saving energy and reducing consumption, and reduce production costs. Seriously do a good job of communication and exchange among all teams, warehouses, purchasing and finished product warehouses in the workshop, and report problems in time to avoid affecting the production progress. Monitor the quality of products in the production process, assist the technical quality department to do a good job in product inspection, conduct regular spot checks on finished products, and strengthen inspections to ensure that the products produced are all qualified products.

iii. On-site management

Improve the production process and operation flow: revise and approve the relevant operation documents in the workshop, optimize management, so that employees can operate in a reasonable and standardized manner, and strengthen the training and communication of shift employees; rationally divide the work, so that each employee can work in the most suitable position, improve the utilization rate of equipment and improve work efficiency.

save production cost. The training of new employees should be easy before it is difficult, and the training with employees should be strengthened.