With the general improvement of the legal awareness of the broad masses of the people, contracts are becoming more and more widely used, and they can protect civil legal relationships. What kind of contracts have you seen? The following is an earthwork project contract template (5 general articles) that I have carefully compiled. It is for reference only. I hope it can help everyone. Earthwork Project Contract 1
Our company plans to build a new _____________ building interior decoration project. In order to ensure the quality and safety of the project and improve economic benefits, in line with the principles of openness, fairness and fair competition, in accordance with the "People's Republic of China According to relevant regulations such as the Construction Law of the People's Republic of China and the Tendering and Bidding Law of the People's Republic of China and the People's Republic of China, and subject to approval by the Municipal Planning Commission, the project is planned to be tendered in the form of public bidding, and the construction team will be selected on a merit-based basis. The bidding conditions and bidding requirements of the project are now explained as follows:
1. Project Overview
1. Project Name: __________________
2. Construction Location: ____________________
3. The planned investment is ____________ million yuan, the nature of the investment: the unit is self-raised, and the funds in place are ____________ million yuan.
4. Functional layout: For details, please refer to the decoration design and construction drawings provided by the owner.
5. Project category: whole building decoration project.
2. Project Bidding Scope
For details, please refer to the decoration design and construction drawings provided by the owner (including lighting, sanitary ware and corresponding pipelines). Interior decoration construction process
III. Contracting method
1. This project shall be based on the winning bid price, bidding period, bidding quality level and this bidding document in accordance with the "Tendering and Bidding Law" and other relevant regulations. Other clauses and relevant provisions of the "Contract Law" shall be signed by the construction party and the construction unit, and the contracting method shall be contracting for work, materials, construction period and quality.
2. Fee collection standards
2-1. Civil engineering: ____________________________.
2-2. Installation project (including water and electricity installation, heating and ventilation, pipeline laying): fees will be charged according to the current quota, and the budget price of materials will be based on the current market price.
2-3. Decoration and renovation projects: Fees are charged according to the current quota. The material budget price shall be subject to *Jian Price [2002] No. 08, and the fee standard shall be subject to Hunan Jian [1999] Price No. 296 This document and relevant supporting documents shall be implemented.
1. The quotation of this project does not include the labor insurance pooling fund (before the bid is opened, the construction party prepays the labor insurance fund in accordance with relevant regulations. After the bid is opened, the labor insurance fund will be calculated according to the actual scale, and any excess will be refunded and any supplement will be included in the total cost).
4. Main material supply and quality requirements
The procurement of materials shall be inspected by the owner and Party B, and may only be used with the consent of the owner and the supervisor.
5. Construction Period
The construction period (calendar days) of this project is determined to be ______ days based on the current national construction period quota and the actual situation of the owner; bidders can decide according to their own actual conditions The bidding period will be determined based on the circumstances.
6. Project Quality
Construction shall be carried out in accordance with the current national construction acceptance specifications and quality standards. The project quality must comply with the engineering design and current specification requirements. Upon completion, the quality grade must reach excellent standards as approved by the local quality supervision department.
7. Contract Signing Requirements
1. The winning bidder shall not subcontract the project; if subcontracting is found, the construction management department will investigate and deal with it in accordance with regulations, and the construction unit will report it to the city With the approval of the Bidding Office, it has the right to select a top-ranked construction unit from the unsuccessful bidder to contract.
2. Sign the construction project construction contract in strict accordance with the relevant national regulations and the relevant requirements of the "Contract Law".
3. Project settlement: This project uses the winning bid price as the basis for settlement of the project price; the increase or decrease (i.e. the workload that was not calculated at the time of bidding or increased or decreased due to design changes), as well as the increase or decrease due to national changes during the contract period Changes in charging standards and material budget prices caused by changes in policies should be adjusted.
The settlement of this project is entrusted to ____________ for review and approval.
4. Appropriation of project price: After the construction contract is signed and ______ days before the start of construction, the project material preparation payment will be paid in advance at ______% of the winning bid price; thereafter, each month will be paid based on the actual amount of the previous month. 60% of the completed construction and installation work will be allocated.
When the project payment (including material preparation payment and progress payment) reaches ______% of the winning bid price, the allocation will stop; the remaining ______% will be paid within two years after the project is completed and accepted and meets the contract requirements. clear.
5. Liability for breach of contract and reward and punishment measures:
5-1. This project implements high quality and low price. If the project is judged as an excellent project upon completion acceptance, the price will be ______% of the winning bid price. Rewards; if the quality level does not meet the bid-winning commitment, the penalty will be ______% of the winning bid price.
5-2. This project is required to be completed within the winning bid time limit; for every day it is delivered in advance or delayed, a reward or penalty of 20,000% of the winning bid price will be given.
5-3. If the construction period of this project is delayed due to the construction party, liquidated damages of 20,000% of the winning bid price will be paid to the construction party every day.
8. Bidding Instructions
1. When obtaining the bidding document, the bidder shall pay a bidding deposit of ____________ yuan to the tenderer as required.
2. After winning the bid and before signing the contract, the bidder must provide the bidder with a bid performance guarantee contract to ensure that once the bidder wins the bid, it will sign the contract and complete the winning project in accordance with the relevant provisions of the bidding documents; for Bidders who fail to provide bid performance guarantees as required will be deemed to have failed to respond to the bidding conditions and will be rejected, and their bid deposits will not be refunded.
2-1. Form of performance guarantee: cash guarantee.
2-2. Guarantee amount: In cash, the performance guarantee limit is ____________ million yuan, and the bid performance deposit will be deposited into the bank account designated by the tenderer.
2-3. Validity period of performance guarantee: The validity period of the bid guarantee is the approved completion period of the winning bid project.
3. Project site survey and bidding Q&A:
3-1. The bidding for this project will be held at the Municipal Trading Center on _____________, month, _____________. meeting and organize project site inspection.
3-2. This project will be held for bidding and Q&A at the Municipal Trading Center on _____________, month, _____________, ____________. Each bidder shall put forward opinions on unclear issues such as the tender document and construction design, and then the tenderer shall give a written reply together with the design unit.
4. The value of the bid quotation:
The upper limit of the bid quotation is ____________ ten thousand yuan;
The lower limit of the bid quotation is _ ___________ ten thousand yuan.
5. Preparation, sealing and delivery of tenders
5-1. Tenders include commercial tenders and technical tenders.
5-2. The content of the commercial bid includes:
5-2-1. Commercial bid A: the degree of response to the bidding documents; the degree of competence and credibility; the comprehensive description (i.e. Project name, scope, quotation, quality level, construction period, warranty commitment, etc.); signatures of bidders and legal representatives; detailed list of project management department personnel; and other documents and certification materials that need to be explained.
5-2-2. Business Bid B: Bid Quotation and Commitment Form.
Bind the above information into a book with two copies (one original and one copy). The bid price and commitment form must be signed by the bidder and legal representative.
5-3. The technical bid is mainly about the construction organization design; this project requires the bidder to provide seven copies of the construction organization design; the requirements are as follows:
5-3-1. Technology The chapters in the bid document are arranged in the following order and requirements:
9. Bid opening, bid evaluation, and bid determination
1. The project is scheduled to be completed in _____________ month_____________ year The public bid opening was held at the Construction Engineering Trading Center of ____________ City on _______.
2. The bidders must attend the meeting: the legal representative or the legal representative’s authorized agent (must hold a power of attorney from the legal person), the project manager bidding for this project, and the total number of each bidder shall not exceed 5 people;
3. All participants must arrive at the meeting on time and abide by the regulations and disciplines at the bid opening site.
4. The following information must be submitted at the bid opening site:
4-1. Original copies of enterprise qualification certificates and business licenses;
4-2. Legal person certificates ( or power of attorney) and corresponding original ID cards;
4-3. Project manager certificate, project technical leader certificate and corresponding original ID cards;
4-4. Construction Valid certificates and documents from the administrative department.
5. The bid evaluation method for this project adopts the comprehensive evaluation method in Chen Jian Zhao Zi No. 6 (there is no minimum bid but upper and lower limits are specified in the bidding document). Please see Appendix 1, Appendix 2, Appendix 3, Appendix 4, and Appendix 5 for the scoring table and weight values.
6. The winning bidder for this project will be determined based on the bid evaluation results. The winner is the winner.
10. In case of any of the following circumstances, the bid or bidding qualification will be invalid
1. The bid is not sealed as required, the business bid is not stamped with the official seal of the unit, and there is no representative Signed;
2. If the technical bid is not prepared and printed as required, the technical bid will be invalid;
3. The bid is not delivered to the Municipal Trading Center within the specified time;
4. Two quotations appear in one tender;
5. The bidding unit is late after the bid opening;
6. The legal representative of the bidding unit or its entrustment The agent fails to attend the bid opening meeting;
7. The authorized agent attends the bid opening meeting without a power of attorney;
11. Other matters
1 . After winning the bid, the bidder must go to the ____________ bidding agency within ten days to receive the bid winning notice issued by the bidder and filed with the Municipal Bidding Office; if the unsuccessful bidder requests reconsideration of the bid evaluation and bid determination results, it must do so within ten days. Written requests must be submitted to the tenderer and the Municipal Tendering Office within working days. Overdue requests will not be accepted.
2. The winning bidder must sign a construction contract with the builder within seven days with the bid winning notice and obtain the construction permit before entering the site for construction.
____________year________month________day____________year_______month________day earthwork project contract 2
Party A: (intermediary)______________
Contact address: _______________________
Party B: (Principal)______________
Contact address: _______________________
In order to give full play to the advantages of both parties, Party A and Party B, In accordance with the "Contract Law of the People's Republic of China", after full consultation between the two parties, and in accordance with the principles of equality, voluntariness, equal value and compensation, the following agreement was reached:
1. Entrusted Matters
Party A accepts Party B's entrustment, provides Party B with information about the project, and ultimately facilitates Party B to sign a professional contract for the project with the construction unit.
2. Party A’s obligations
1. Party A must provide Party B with information about the project and is obliged to assist Party B in conducting on-site inspections of the project and related business matters. .
2. Party A promises that the relevant information about the project provided to Party B is true and reliable.
3. Party B’s obligations
1. Party B is responsible for providing qualification certificates, business licenses and other relevant information; and is responsible for contract negotiations with the construction unit.
2. If the intermediary is successful, Party B will fully perform the professional contract contract signed with the construction unit. Party B's rights and obligations arising from the performance of the contract have nothing to do with Party A.
3. If the intermediary is successful or the project information provided is valid, Party B shall pay the intermediary remuneration to Party A in accordance with this agreement.
4. Amount of intermediary remuneration, payment time and method of payment
1. Total project intermediary fee______________
Project information fee____________________
< p> Project commission ____________________________.A. Project information fee
For projects with a decoration area of ??________㎡ (inclusive), the project will be worth ________ yuan; for projects with a decoration area of ??________㎡, the project will be worth ________ yuan.
B. Project commission: ________% of the net contract amount
1) The intermediary only provides project information and does not recommend direct negotiations with the construction unit. The intermediary commission is ________% if the intermediary is successful.
2) An intermediary who introduces direct negotiations with the construction unit and participates in the contract negotiation, and the intermediary will receive a commission of ________% if the intermediary is successful.
3) The net contract value refers to the contract value after deducting rebates from the construction unit and ________% tax.
4) The intermediary can assist in negotiations, and when higher profits are obtained, the project commission amount can be negotiated.
2. Project information fee issuance: Party B participates in the construction unit's quotation, and the customer can track it after the quotation, and it will be distributed within two weeks after the quotation.
3. Project commission issuance: After the project contract is signed, it will be distributed one by one according to the proportion of the progress payment. Each payment will be within one week of the progress payment being recorded, or it will be released in one go after the project is accepted. Which method will be used by both parties? Can be agreed separately.
4. Party B can pay by transfer or cash.
5. Confidentiality matters
1. Both Party A and Party B shall fully keep the business secrets involved in this agreement.
6. Termination of the Agreement
1. After this Agreement is signed and becomes effective, it will be valid for _________ years.
7. Other Matters
1. Party A shall not sub-entrust matters entrusted in this Agreement.
2. This agreement is made in two copies, with each party holding one copy. It will take effect after being signed and sealed by both parties.
Party A: (seal) ____________________________ Party B: (seal) ____________________________
Legal representative or authorized agent: ____________________________________________
Contact information: _______________ _Contact information: _______________________________
_______________year________month________day_______________year________month________day Earthwork Project Contract 3
Client: __________________________________________________ (hereinafter referred to as Party A)
Undertaken by: _______________________________________________ (hereinafter referred to as Party B)
After friendly negotiation and in line with the principle of mutual respect, Party A entrusts Party B with the production business. In order to clarify the Responsibility, ensure the completion of tasks, and *** agree to abide by the contract. After consensus reached by both parties, the following agreement has been signed for both parties to abide by and implement.
1. Main requirements:
(1) Project name: __________________________________________________
(2) Installation location: __________________________________________________
(3) Other contents: __________________________________________________
(4) Total budgeted cost: __________________________________________________
(5) Technical information and drawings provision method: ________________________________________
2. Production period: < /p>
The content of this contract begins with the design and production on ____ month ____, _____ year, and will be completed before ____ month ____, _____ year.
3. Settlement method:
1. On the date of signing of this contract, Party A prepays ___% of the total cost to Party B as the site advance payment in RMB______ yuan, and the balance ___% shall be settled in one go according to the actual measured dimensions within 15 days after the completion of the project installation. Clear the balance, and the balance of ___% will be used as a quality deposit to be settled after half a year.
2. During the operation of the contract, if content is added outside the contract and approved by both parties, Party A shall first pay 50% of the additional part of the payment, and the remaining 50% shall be paid in one lump sum after acceptance.
4. Construction, demolition and design changes:
1. Party B shall organize production according to requirements and meet qualified standards.
2. During the construction process, Party A shall actively cooperate with Party B’s on-site coordination work.
5. Project inspection and warranty:
1. Party B shall notify Party A for acceptance within two days after the completion of the project. If Party A fails to inspect and accept it within the time limit, Party B will make an inspection and pass it if it is used.
2. During the acceptance inspection, if any quality problems caused by Party A's responsibility are found and suggestions for rework or repairs are made, Party B will complete the work within the specified time limit and charge the corresponding cost of work. If Party B causes quality problems, Party B will replace them free of charge.
3. The project warranty period is 1 year (except for man-made and irresistible natural disasters).
6. Project Responsible Person and Work-related Injury Accidents:
1. Party A appoints the on-site person in charge, and together with the on-site person in charge appointed by Party B, they will jointly perform this Agreement various provisions of the contract.
2. Party B should educate workers to strictly abide by operating procedures, do fire prevention and anti-theft work, and comply with relevant regulations on the construction site. Party B will be responsible for any losses caused by work-related injuries during construction.
7. Special instructions:
If the power supply is needed at the project site, it should be arranged within 1 meter from the product.
On-site installation positioning and other matters involving installation coordination shall be resolved by Party A;
8. Other terms:
1. When the client is approving the design content, please carefully review every detail of the project and sign or approve the statement after the review. If an error occurs after confirmation, the client shall bear all responsibilities and all contents.
2. After the contract is signed, if there is a unilateral breach of contract, all liability will be borne by the breaching party. If either party needs to change this contract or other special requirements, both parties must reach an agreement through consultation. Sign a separate supplementary contract.
3. Contract Attachment
1. ____________________________________________________________
2. ____________________________________________________________
9. Dispute Resolution:
If a dispute occurs during the execution of this contract, Both parties should try their best to resolve the dispute through negotiation. If the negotiation fails, either party may submit an arbitration to a competent arbitration institution or file a complaint in court.
1. The contract attachments and supplementary contracts have the same legal effect as this contract.
2. This contract is made in four copies and will take effect after being signed and sealed by both parties.
Party A: Party B:
Address: Address:
Contact number: Contact number:
Business representative: Business representative: < /p>
Signing date: Earthwork Project Contract 4
Party A:
Party B:
Projects undertaken by Party B (below (referred to as the project), *** building, total construction area m2, total project cost of 10,000 yuan, Party A and Party B agree to cooperate in the construction of the project, and enter into the following terms:
1. The project is independently owned by Party B Organize the construction, implement independent accounting, and be responsible for its own profits and losses. The funds, materials, labor, etc. required for the construction of the project shall be funded and prepared by Party B, and shall be responsible for the organization. The after-tax profits realized shall belong to Party B. Any losses incurred by the project shall be borne by Party B. Party A shall Party has nothing to do with it.
2. Party B is responsible for paying all the fees payable to the relevant departments and all taxes (including business tax and corporate income tax) required for the project; the relevant claims and debts incurred during the construction of the project Party B is responsible for recovering or repaying all damages, and Party B is responsible for paying workers’ wages, and shall not be in arrears with workers’ wages. Party B must pay all taxes and fees before the project is completed. Otherwise, Party A will not go through the completion acceptance procedures, and Party B will be responsible for the relevant responsibilities.
3. Party B shall organize the construction management structure in accordance with the project manager responsibility system, and equip sufficient engineering technicians, quality officers, and safety officers. The person in charge of the project shall be responsible for the construction management of the entire process of the project and achieve the goals of construction. The unit’s construction schedule requirements and project quality standards. If the required engineering project schedule does not meet the standards, a fine of 100,000 square meters per square meter of construction area will be imposed for the parts that do not meet the standards. Safety production and civilized construction have reached the excellent rate indicators issued by the Zhongshan Municipal Construction Bureau. Party B must implement relevant national production safety regulations, ensure construction safety, and bear all losses and responsibilities caused by safety accidents.
4. The project payment will be transferred to Party A’s account. After Party A deducts the management fees and taxes, the balance will be transferred to Party B within three days. Party A will be responsible for accounting for the project, and Party B will provide the account and subcontracted project payment. tax invoice.
5. Party B must implement the relevant regulations on building warranty formulated by the state and be responsible for the warranty responsibilities after the project is completed and accepted.
VI. Responsibilities of Party A:
1. Responsible for providing construction application materials for construction application for the project.
2. Implement technical guidance, supervision and consultation on the engineering project. Party A’s representative responsible for construction site supervision is .
3. Supervise the quality, safe construction and civilized construction of construction projects.
4. Review the completion acceptance data of the project and assist the owner in organizing the completion acceptance.
7. The management fee paid by Party B to Party A is 1.2% of the total project cost. The management fee will be deducted each time the payment for the first phase of the project is received.
8. Contents of the agreement between Party A and the industry for this project.
9. This contract will take effect from the date of signing. Both parties must abide by it. This contract is made in two copies. Party A and Party B each hold one copy. The completion acceptance of the project meets the requirements and all payments and taxes are settled. Except for the relevant warranty terms that come into effect, other terms will be terminated; after the warranty period expires, the warranty terms will be terminated.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________year____month__________year____month____day Earthwork Project Contract 5
Client: _______________ (referred to as Party A)
Entrusted party: _____________ (referred to as Party B)
Party A entrusts Party B to carry out _______________ operations on _______________ and signs the following contract.
The first business object
Name:_________________________
Location:_________________________
Working area:_________________________
Article 2 Scope and content of work
_________________________________________.
Article 3 Cleaning tools and some consumables
_________________________________________.
Party B will contract the work in the form of a contractor, and Party B will be responsible for the operating machinery and supporting tools.
Article 4 Contracting Fees and Settlement Methods
____________________________________________.
Article 5 Construction Period
Party B’s start date shall be notified by Party A, from _________year________month_________ to _________year________month Ending on _________, the time is ______ days. (If the delay is caused by force majeure reasons such as delay of the overall project, cross-construction, etc., the final date negotiated by Party A and Party B shall prevail)
Article 6 Special expenses for business outside the contract
If Party A entrusts Party B to carry out business expenses other than this contract, the expenses shall be decided through negotiation between Party A and Party B in advance.
Article 7 Responsibilities and Obligations of Party A
1. Supervise and inspect Party B’s cleaning and cleaning work:
2. Provide Party B's workers with necessary working conditions such as water, electricity (safe electricity), warehouses for storing equipment, and cleaning agents during work:
3. Coordinate the relationship with relevant departments in Party B’s work:
4. Pay Party B’s labor costs in a timely manner.
Article 8 Responsibilities and Obligations of Party B
____________________________________________.
Article 9 Liability for breach of contract and modification of contract
1. Party A has the right to punish Party B for quality problems and illegal operations that occur during operations.
2. During the contract period, if either party is unable to perform the contract due to reasonable reasons, it must notify the other party in writing _________ days before terminating the contract. Otherwise, the party terminating the contract will pay 50% of the contract's performance as liquidated damages.
Article 10 Checkout method
_________________________________________.
Article 11 Others
If there are any objections to matters not stipulated in this contract or the interpretation of this contract, Party A and Party B shall resolve it through negotiation in good faith. This contract is made in ________ copies and will take effect after being signed and sealed by the responsible persons of both parties. The ________ copies held by both parties are equally valid.
Party A (seal): _________ Party B (seal): _________
Representative (signature): _______ Representative (signature): _______
_________year____month____day_________year____month____day
Place of signing: _____________ Place of signing: _____________