First, if the operating income does not exceed RMB 6,543,800,000, it will be extracted by 2%;
Two, the operating income of more than 65.438 billion yuan to 65.438 billion yuan, according to 654.38+0% extraction;
Three, the operating income of more than 1 billion yuan to 1 billion yuan, according to 0.2% extraction;
4. The part of operating income exceeding 1 100 million yuan to 5 billion yuan shall be extracted by 0. 1%;
Five, the operating income of more than 5 billion yuan, according to 0.05% extraction.
For example, operating income120,000, of which10,000 draws 3%, and the remaining 2 million draws 1.5%, and then adds them up. When the balance of the special account for security expenses of small and medium-sized enterprises and large enterprises at the end of last year reached 5% and 2% of the sales revenue of the enterprise in the previous year respectively,
The extraction standards for safety expenses of various engineering categories are as follows:
(a) housing construction engineering, mining engineering is 2.0%;
(2)1.5% for power engineering, water conservancy and hydropower engineering and railway engineering;
(3) 1.0% for municipal utilities, smelting, electromechanical installation, chemical and petroleum engineering, port and waterway engineering, highway engineering and communication engineering. The safety expenses extracted by the construction enterprise shall be included in the project cost and shall not be deleted when bidding. Where the state has other provisions on the budgetary estimate of capital construction investment, such provisions shall prevail. The general contractor shall pay the safety expenses directly to the subcontractors in proportion, and the subcontractors shall not extract them repeatedly.
Jolin Tsai, will Xiao Shenyang participate?