2) Since March 2005, he has been a professor in the Department of Traffic Engineering, School of Civil Engineering, Beijing University of Technology, engaged in the research on Olympic traffic planning and organization, travel behavior and public transport planning.
3) From March 2004 to March 2005, I worked as a visiting scholar at Imperial College London Transportation Research Center in London, engaged in the research of navigation path optimization algorithm based on traffic reliability.
4) 1999/04-2004/03, Associate Research Fellow, Department of Traffic Engineering, School of Civil Engineering, Beijing University of Technology, engaged in traffic network unblocked reliability evaluation and road network optimization research.
5)1997/06-1999/04, postdoctoral fellow, School of Aeronautics and Astronautics, Harbin Institute of Technology, engaged in the research on seismic reliability optimization of lifeline network.
Four main research directions
Traffic planning, road network optimization, route guidance, road network reliability analysis, intelligent transportation, traffic energy saving and emission reduction, etc.
5. Take on the main task
1).973 Pre-planning research topic, basic theory research of urban traffic behavior process, 2013/01-2015/12110,000, under research and under participation.
2). The sub-project of National High-tech Research and Development Plan (863 Plan), Research on Mobile Data Processing and Rail Passenger Flow Algorithm, 2013/01-2014/12.27 million, is under research and presided over.
3). A sub-project of the National High-tech Research and Development Plan (863 Plan), Research on the Standardization Method of Public Transport Network Optimization, Adjustment, Evaluation and Decision Support, 2013/0141230000, is under study and presided over.
4). The key project of Beijing Natural Science Foundation, Research on Collaborative Mechanism of Multi-mode Travel Chain and Key Technologies of Public Transport Integration, 2013/01-201512630000, is under study and presided over.
5). Youth Science Fund Project of National Natural Science Foundation of China, Study on Optimization Model of Accessibility Matrix of Urban Road Network, 2013/01-2015/12,250,000, under research, participating.
6). The general project of Science and Technology Plan of Beijing Municipal Education Commission, Travel Time Estimation Model under Uncertain Traffic Conditions, 2013/01-2016/01,150,000, under research and participation.
7). The major project of Science and Technology Plan of Beijing Municipal Science and Technology Commission, Research and Demonstration of Integrated Technology of Urban Passenger Transport Hub, is 20101-201/72.96 million, which has been concluded and participated.
8). Sub-project of National Science and Technology Support Plan, Research and Demonstration Project of Mountain Highway Network Safety System, 2009/01-20112, 1.5 million, which has been concluded and presided over.
9). Traffic Hub Simulation System, a sub-project of National Science and Technology Support Plan, 2008/08-201012,149,000 yuan, has been completed and presided over.
10). A sub-project of National Science and Technology Support Plan, Research on Reliability Guarantee Technology of Urban Comprehensive Transportation System, 2007/01-2012,450,000, which has been concluded and presided over.
1 1). Sub-project of National Science and Technology Support Plan, Bus Information Service Technology, 2007/01-2012,340,000, which has been concluded and presided over.
12). The sub-project of National Science and Technology Support Plan, Bus Monitoring and Regional Dispatching Technology, 2007/01-2012,630,000, has been concluded and presided over.
13). The sub-project of National Science and Technology Support Plan, Coordinated Operation of Urban Public Transport System and Multi-mode Integration Technology, 2007/01-20112.3 million, has been concluded and presided over.
14). The Tenth Five-Year Key Science and Technology Project, the key technology development and demonstration project of intelligent transportation system-Olympic transportation planning, 2002/0/-2004/1 2,110,000, has been concluded and presided over.
15). The Youth Science Fund Project of the National Natural Science Foundation, Research on Disaster-resistant Planning and Post-disaster Management Optimization Method of Urban Transportation System, 200101-2004/12,180,000 Yuan, has been concluded and presided over.
16). Beijing Natural Science Foundation Project, Operation Evaluation, Simulation and Countermeasures of Road Traffic System in Big Cities, 2000/08-2003/08, 90,000 yuan, concluded and presided over.
17). The key project of Beijing Natural Science Foundation, Research on the Interactive Relationship between Urban Traffic Carrying Capacity and Land Development, 2005/08-2006/08,500,000, has been concluded and participated in.
18). research on Olympic traffic simulation system, a major project of Beijing science and technology commission's science and technology plan, 2005/08-2006/084, has been concluded and participated in.
19), a key project of Beijing Natural Science Foundation, Research on Traffic Flow Characteristic Parameters and Models of Intelligent Transportation System, 2002/01-2005/12.5 million, which has been completed and participated in.
6. Talent Fund Project
1) Beijing municipal education commission's high-level talent training project, research on key technologies of coordinated optimization of multi-level bus network and hub in big cities, 20101-20112, which has been concluded and presided over.
2) One Million Talents Training Project in Beijing in the New Century, Research on the Planning and Security System of New Rural Public Transport Network, 20101-20112, has been concluded and presided over.
3) Beijing Science and Technology Rising Star Project (Class A), Research on Key Technologies of Traffic Demand Management during and after the Olympic Games, 2002/08-2004/08, concluded and presided over.
4) Research on Rapid Transit System Planning and Its Key Technologies, supported by Fok Ying-tung University Young Teachers Education Foundation, concluded and presided over from July 2005 to June 2008.
5) Funding Plan for Key Teachers in Colleges and Universities of Ministry of Education, Optimization Strategy for Emergency Traffic Management and Recovery of Post-disaster Road Traffic System, 2000/0/-200112, which has been concluded and presided over.
7 Scientific research achievements and published monograph "Safety Design Guide for Vulnerable Groups at Urban Road Intersections", 20 10.2, People's Communications Publishing House, 978-7-114-08083-8, Chen Yanyan, and Yuanhe "Urban Traffic Demand Management and Application", 2009./. 978-7- 1 14 People's Communications Publishing House, 7-14-05785-7, Chen Yanyan, Liu Xiaoming, Liang Ying, Multi-level Bus Network Planning and Evaluation Technology, 201/kloc-. Wang Zhenbao, planning and simulation of crowded pedestrian traffic system, 20 1 1.03, People's Communications Press, 978-7-14-08802-5, Chen Yanyan, Shi Jiangang, intelligent traffic information collection, analysis and application, 20. 978-7-114-09492-7, Chen Yanyan, supporting technology of high-reliability urban road network in Wangdongzhu, 20 12.05, People's Communications Publishing House, 978-7-12-15. 20 13. 1 1, People's Communications Publishing House, 978-7-114-10282-0, Chen Yanyan, Zhou Yuyang.