How to write the cooperation plan for after-sales maintenance of air conditioners?
I hope I can help you.

Air conditioning maintenance contract

Party A:

Party B:

According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party A and Party B reached an agreement on air conditioning maintenance through friendly negotiation, and agreed to sign this contract and perform it as agreed by both parties.

I. Subject matter of the contract

Entrusted by Party A, Party B provides xxx brand air conditioning system with paid maintenance service for its business hall. The maintenance scope includes: the maintenance of the host, the terminal and the whole system.

Including: 2 business hall hosts and 10 terminals; The maintenance fee is charged by RMB/set for the business hall host and RMB/set for the terminal. In total, the total annual contract price is RMB Yuan only. Rmb: yuan

Second, the maintenance cycle:

Year after year.

Three. Payment terms:

Party A shall pay the full amount, i.e. RMB Yuan only, within 10 days from the date of signing the Contract.

Four, maintenance service standards and content:

Carry out air conditioning maintenance in strict accordance with xxxx air conditioning system maintenance manual.

Details are as follows:

1. The air-conditioning terminal system should be sterilized, disinfected and purified once a year at the beginning of Xia Dong, so as to eliminate the breeding of microorganisms and the root of bacteria, and make the air-conditioned air sent by fans meet the air hygiene standards.

2. The host system and pipeline should be treated once a year.

Check the main power supply of the solid-state wiring connector electrically.

Control Power Supply

Compressor motor

Exhaust fan motor

Distribution cable for measuring insulation resistance

electric radiator

Compressor motor

Exhaust fan motor

Various sensor for measuring DC resistance

electric radiator

Compressor motor

Exhaust fan motor

Check the temperature and pressure of the compression cylinder during normal use.

Water inlet and water outlet of evaporator

Condenser inlet and outlet water

Compressor inlet and outlet refrigerant

Check the current and voltage of the main power supply during normal use.

Compressor motor

Exhaust fan motor

Control Power Supply

Normal use of check valve temperature control switch

Water flow switch

Exhaust valve and makeup valve

Indoor air ducts shall be inspected and maintained once a year.

Comb ribs once a year (season)

Wash the ribs once a season.

Clean the filter once a year.

Change the circulating water of the system once a year.

Verb (abbreviation of verb) Party A's responsibility:

1. Provide convenience for Party B to enter and leave the air conditioning maintenance work.

2. Provide complete air conditioning technical data.

The intransitive verb Party B's responsibility.

1. Provide Party A with air-conditioning maintenance services in strict accordance with the company's air-conditioning maintenance manual.

2. Accept the supervision of Party A and ensure the service is in place.

3. Arrive at the site within 24 hours after receiving the repair notice from Party A..

4. The replacement of faulty spare parts shall be submitted to Party A for inspection, and only the cost of spare parts and materials shall be charged for maintenance. See spare parts price list for details.

5. There must be a maintenance order for each maintenance, which should be signed by the user department and the property department for confirmation; Maintenance items with expenses incurred outside the contract need to be signed and confirmed by the Power Department.

Seven. Termination of the contract:

A. In any of the following circumstances, Party A has the right to notify Party B in writing to terminate this contract:

1. Party A shall provide relevant property right change certificates.

2. The maintenance project failed to be fully performed on schedule with good quality for more than one quarter, which was identified as a real problem by the authoritative department of xxx City.

3. Party A is unable to perform the contract due to force majeure.

B under any of the following circumstances, party b has the right to notify party a in writing to terminate this contract:

1, changed hands.

2. Party B is unable to perform the contract due to force majeure.

3. Party A is bankrupt, liquidated (except for merger or reorganization) or unable to repay the debts payable.

Eight. Liability for breach of contract:

1. If Party A breaches the contract, it shall pay Party B a penalty of RMB xxx only. Party B has the right to request Party A to continue to perform this contract.

2. If Party B breaches the contract, it shall pay a penalty of RMB xxx to Party A. Party A has the right to require Party B to continue to perform this contract.

Nine. Other agreed matters:

1. If spare parts are replaced, the expenses within xxx yuan shall be borne by Party B, and the expenses above xxx yuan shall be borne by Party A..

2. Party B shall not be responsible for the losses caused by the third party's air conditioning maintenance.

3. Matters not covered in this contract shall be settled by both parties through friendly negotiation.

X this contract is in quadruplicate, with party a holding three copies and party b holding one copy. This agreement shall be established after being signed and sealed by both parties, and shall come into force according to law.

Party A: Party B:

Legal representative:

Handler: Handler:

Date: Date: