According to Article 7 of the Measures for Quality Warranty of Housing Construction Projects, the quality warranty period is two years, and the developer can be found during the warranty period. If the public maintenance fund is paid outside the warranty period, it shall be solved by using the public maintenance fund; If there is no * * * maintenance fund, it shall be solved by * * with the contribution of all residents of the pipeline.
Extended data:
The State Council's "Regulations on Quality Management of Construction Projects" stipulates in Article 40: The construction unit shall be responsible for repairing the construction projects with quality problems or unqualified completion acceptance.
(a) the reasonable service life of the building foundation engineering, foundation engineering and main structure engineering specified in the design documents;
(2) 5 years for roofing waterproof works, toilets, rooms and external walls with waterproof and anti-leakage requirements;
(3) The heating and cooling system consists of two heating periods and cooling periods;
(four) electrical pipelines, water supply and drainage pipelines, equipment installation and decoration works, for 2 years.
Article 41 of "Regulations on Quality Management of Construction Projects" in the State Council stipulates that if quality problems occur in construction projects within the warranty scope and warranty period, the construction unit shall fulfill the warranty obligations and be responsible for the losses caused.
References:
Yueyang Municipal People's Government-Who is responsible for repairing the rupture of the main water supply pipeline in the residential area?