(1) Capital construction work
1. 17 construction of student apartment building started. 17 student apartment building is a continuation project in the Twelfth Five-Year Plan, with a construction area of 38,456 square meters and functions as a student dormitory. 20 12 with the vigorous promotion and efforts of the school, the problem of planning adjustment and demolition of the training center of the Party School of the Ministry of Land and Resources on the fourth floor of the East Third East was solved, and the project officially started on 20 12+ 1 1.
2. Report the feasibility study report of the engineering experimental building. The Engineering Experimental Building (formerly Jewelry Building) is a newly-built project in the 12th Five-Year Plan of our school. The Infrastructure Division has completed the preparation of the feasibility study report of the project and submitted it to the Ministry of Education for approval.
(2) Decoration and repair work
1. communication center renovation project. In order to welcome the 60th anniversary of the school and improve the conference environment, we applied for special funds for the renovation of the exchange center on 20 12. After several months of intense construction, the functions of the exchange center have been improved, and the decoration style is consistent with the supporting buildings. The project was officially handed over in August, 20 12, which ensured the arrangement of the meeting during the celebration.
2. Renovation and repair of the original school history museum, school trade union and Muslim restaurant. The former school history museum, the school trade union and the Muslim restaurant are a series of old buildings located on the north side of the school's summer cultural square. They are in disrepair for a long time and the lines are aging, which is in urgent need of repair. From 20 1 1, the school applied for special funds for renovation and began to rebuild and repair these buildings. On 20 12, the transformation of the school history museum was completed, and the original school history museum was transformed into the health care room of the school hospital and the office space of the school trade union; The school union completed the renovation of the staff canteen and handed it over for use; Complete the restoration and handover of the Muslim canteen.
3. Complete the construction of green space. 20 1 1 Demolish the student activity center and build a swimming pool green space on the original plot. The green space construction was completed on 20 12, and passed the acceptance of Beijing Greening Engineering Association.
(3) Infrastructure renovation
1.20 12 1 complete the relocation of No.5 transformer and distribution room, and reserve the power capacity of 17 student apartment.
2. Overall planning of school electricity load to ensure the safety of electricity consumption during the celebration. The construction electricity consumption of the newly-built 17 building was adjusted and reformed, including the electricity consumption of 14 building, Muslim restaurant, staff canteen, school hospital and trade union office building, and the electricity consumption of the east first floor and the second floor.
Second, the logistics work
1. Campus environment improvement. According to the relevant requirements of the celebration office, the Logistics Department has formulated the 60th Anniversary Celebration Implementation Plan of China Geo University and the 60th Anniversary Celebration Logistics Support Group Implementation Plan, and carried out the campus environment improvement work. Combined with the 60th anniversary celebration, the campus was comprehensively afforested and beautified with the greening around the international conference center, gymnasium, library and Yifu Building as nodes. Complete the re-carving of the stone statues of Li Siguang, He Changgong, Gao Yuangui, Liu Xing and "Geologist". Complete the Taishan stone carving with Premier Wen Jiabao's inscription "Cradle". Complete the "cornerstone" project of the school. In order to celebrate the 60th anniversary of the celebration, and to set off a festive, joyful and vigorous atmosphere on campus, the flower bed layout project for the celebration was implemented in accordance with the principle of "grand and warm, prominent in theme, moderate in scale, innovative and thrifty". Complete the maintenance and renovation project of silicon PU plastic basketball court in school playground and basketball court in Zhoukoudian practice station. Complete the maintenance project of the steps below the east side of the school playground grandstand; Finish painting, paving and maintenance of the school playground stands (podium). Complete the project of laying permeable bricks in the western family area, installing security doors and plastic steel windows in residential buildings. Complete the restoration and cleaning project of Chairman Mao's statue. Complete the maintenance of the main entrance (middle door) of the main building; Complete the painting project of office building, geological dispatching building and playground network protection. Complete the tree crown pruning project of the main road on campus. Complete the transplanting project of 37 Pinus tabulaeformis trees on the north side of the playground fence. Complete the tree transplant project of the building project of the student apartment17th floor. On the anniversary day, the large-screen cable laying project in front of the library was completed. Complete the temporary adjustment project of the school celebration party venue (playground). Complete the waterproof project of the comprehensive office building and the roof of the eighth floor as soon as possible; Complete the maintenance and painting works on the third and fourth floors; Complete the maintenance and painting of the corridor of the experimental building; Complete the renovation project of 22 bathrooms in the experimental building; Complete the laboratory reconstruction project of the Institute of Land Science and Technology; Complete the laboratory reconstruction project of the School of Water Resources and Environment; Complete the laboratory maintenance and renovation project of the College of Materials Science and Engineering; Complete the transformation of activity rooms in 19 and 1A buildings into new dormitories; Complete the renovation project of the bathroom on the first floor; Complete the maintenance and renovation project of the bathroom in the experimental building; Complete the maintenance project of international students' dormitory.
2. Buy dormitory furniture. According to the school's 20 12 annual purchasing plan for desks and chairs in students' dormitories, public bidding was conducted for the society. * * * purchased 500 bunk beds, 70 sets of eight-grid iron cabinets, 50 iron bookshelves, 80 tables with two drawers, and 0/500 iron square stools/kloc.
3. Real estate work. Complete the school staff housing subsidy budget; Completed the payment of housing subsidies for faculty and staff of 7.2937 million yuan; Completed the payment of transportation, property and heating fees for the staff living in the school, with a total amount of more than 3.8 million yuan. On behalf of the school to complete the supervision and management of the property service work of Guotian Property Company; Make its property management more humanized and its property service more harmonious and stable.
4. Complete the reception teaching practice in Beidaihe and Zhoukoudian practice stations. Zhoukoudian Practice Station * * * received 42,200 students and teachers 1.900; Beidaihe practice station received 39 123 students and 3,202 teachers (including: Beijing students 17486 students and teachers 1548 students); Foreign teachers 188 person-times, students 14 14 person-times.
5. Electric power and energy-saving work. Conscientiously implement the spirit of the National Energy Conservation Law, the Twelfth Five-Year Plan for Energy Conservation and Emission Reduction and the Implementation Plan for Energy Conservation and Water Saving of China Geo University; It has passed the supervision and inspection and special inspection of energy-saving work in schools by the state and various departments in Beijing, and rectified the problems found; Write "China Geo University (Beijing) Energy Utilization Report" in triplicate and report it to government agencies respectively; Compile the emergency plan for water supply of China Geo University (Beijing) and change the hygiene license; Compile the Regulations on Air Conditioning Management of China Geo University (Beijing); Write the Investigation Report on School Power Supply Protection System, evaluate the current situation of school power supply, analyze the causes of high voltage trip, put forward countermeasures, actively organize emergency repair, and basically ensure normal power supply; 4 1000 energy-saving lamps, with a total price of10%; Apply to the Ministry of Housing and Urban-Rural Development for 2.7 million yuan for the construction of energy consumption monitoring platform; On the basis of version 20 1 1, continue to improve the underground pipeline map. 20 12 high voltage is divided into low voltage and high voltage. Continue to complete the second and third phases of the weak current underground network project of China Geo University (Beijing); Clean up the open lines in the campus, and pull out more than 30 cement poles along the main roads and on the west side of the stadium stands; Ensure the smooth operation of elevator, reclaimed water and frequency conversion control system; Strengthen the management of all secondary measuring instruments; Repair the short circuit accident of overhead open wire for many times; Complete the accounting and collection of water and electricity costs of operating units in the school; Complete the collection, statistics, compilation and archiving of monthly, quarterly and annual statistical reports and related materials of Beijing and the Ministry of Education; Cooperate with secondary school units to complete energy-related work; Complete the debugging project of relay group in distribution room, and issue a "test report" to rectify the five major problems that have been debugged; Detection and debugging of lightning protection system in campus buildings; Replace the main valve and the valves on the first, second and third floors of senior high school as soon as possible; Implement 9 10 downstairs water renovation project as soon as possible; Replace the water supply tank in the west area; The steam pipeline was repaired, which solved the problem of air leakage everywhere; Complete the cleaning of water source heat pump in scientific research building; The water leakage problem of Xue 19 building has been solved for many years.
6. The Logistics Department signed a service guarantee agreement with the Logistics Group. The Logistics Department and the Logistics Group signed a 14 service guarantee agreement with a total capital of 2 1.95 million yuan. In 20 12 years, the logistics system completed the logistics support tasks assigned by the school with enthusiasm, high quality, high efficiency, civilization and safety, and the management level and service quality were improved.
7. Improve the provisions revision system. The Finance Department of Logistics Group has done a lot of work in the system of the group's fund budget, income management, fund approval and financial supervision according to the requirements of the school's fund use, which has improved the group's financial management process and ensured the rationalization of the group's fund use. On the basis of the existing procurement system, the Group Procurement Center has added new contents such as procurement market inspection standards, procurement analysis system and inventory management system, which greatly improved the quality of purchased products while reducing procurement costs.
8. Various services. Adhering to the concept of "people-oriented", Logistics Group aims to improve the satisfaction of teachers and students in the whole school, enhance service awareness and do a good job in various services. The dining center successfully passed the joint inspection of the "Five Ministries and Commissions on Strengthening the Work of University Canteen" by the Municipal Education Commission, and applied to the Municipal Education Commission for the acceptance of standardized canteens. The green sanitation service center has passed the preliminary acceptance of standardized campus. The Transportation Service Department of Logistics Group was rated as "Advanced Unit of Traffic Safety in Haidian University System". During the summer vacation, the logistics support of Zhoukoudian practice station was successfully completed. The mail room received and sent 26,095 registered letters, express mail, remittances and parcels, an increase of 3% over last year, without any mistakes. The property service department charged about 2.75 million yuan for rent, water and electricity, and successfully completed all the indicators issued by the school; The elevator service department is responsible for the normal operation of 4/kloc-0 elevators in the school.
10. Improve service capacity. Improve the ability to deal with emergencies and cooperate with the completion of large-scale school activities, respond quickly to emergencies, sum up experience in time, form feedback, and further improve the management system. In the face of the "7.2 1" torrential rain, under the unified deployment of the school, Qixin and Qi Xin made concerted efforts to ensure that all posts adhered to their posts and responded immediately, thus minimizing losses.
Three. Neighborhood Committee work
(1) School work
1. Ensure the effect of comprehensive community management, strengthen management and prevent rebound. With the strong support of the school and the relevant departments of Xueyuan Road Sub-district Office, the neighborhood committee has ensured the governance effect by strictly guarding against death and taking turns on duty on holidays.
2. Strengthen the management of illegal construction and do everything possible to prevent new illegal acts. 20 12 * * * Stop and demolish 18 illegal buildings under construction.
3. Stop more than 20 incidents of illegal decoration and demolition of load-bearing walls. In case of individual disobedience, immediately report to the logistics and real estate department to dissuade them together.
4. Most of the doors and windows in the corridor of the old building are updated, and the open loess ground in the community is all hardened, which not only beautifies the environment, but also increases more than 50 parking spaces.
5. Assist the Ministry of Infrastructure to deal with the problem of disturbing people and crowded students' apartment building 17. Residents' symposiums and communication meetings have been held many times, and through the introduction and explanation of the project, the support of the vast majority of residents for the project construction has been won.
6. Create a celebration atmosphere and reduce the influence of the community environment on the celebration. With the support of schools and Xueyuan Road, neighborhood committees have carried out large-scale community environmental sanitation management. Clean up the garbage corner behind the 9 th floor of the community and along the dripping edge of the old building for many years; Assist the security department to check the fire safety hazards in residential areas many times, and jointly clean up the fire safety hazards in community residential areas 13 with the police station and urban management department; Cleaning includes fire hazards such as fire hydrants occupied, corridors blocked, fire exits occupied, and a large number of flammable debris piled up in front of and behind the house; Cooperate with the security office to prevent dogs from entering the teaching area; Three concentrated small advertising campaigns were carried out, and small advertisements on the main sections of the street were cleaned up before the celebration; Contact Haidian Experimental No.3 Primary School to paint its external wall to avoid negative impact on the celebration; Before the celebration, a large-scale environmental renovation was carried out in the family area, and more than 30 deposits and obstacles outside the building were removed; Concentrate on cleaning up more than 450 used bicycles in the community; There have been more than 10 emergency repairs, minor repairs, ground collapse damage, emergency duty rescue in heavy rain, and emergency snow sweeping in heavy snow; On the day of the celebration, all social workers and 30 volunteers will be arranged to patrol the community and monitor key people all day to prevent the celebration from being affected.
(2) Community building
Xueyuan Road Sub-district Office supported 65,438+10,000 yuan to rebuild the bicycle shed on the 26th floor, 50,000 yuan to harden the 9th floor and the east side of 10 floor, and 50,000 yuan to repair the road at the intersection of 18 floor. Establish convenient dishes. In 20 12 years, according to rough statistics, various vegetables sold more than 375,000 kilograms. Compared with the nearby community, the price is low, which provides convenience and welfare for teaching staff. Convenient dried fruit shop was established, with annual sales of about10.2 million Jin of fruit. Agricultural and sideline products such as Chinese cabbage, sweet potato, honey and rice are introduced seasonally to provide convenience and benefits for residents. The introduction of vegetable and fruit garbage will play a certain role in environmental protection and energy saving in schools.
(3) Street work
The community cooperates with Xueyuan Road Sub-district Office to carry out a number of work for residents, involving party building, civil affairs, social security, population, family planning, women's federations, disabled persons' federations, comprehensive management, judicial opinion polls, conscription, sports, health, fire protection, safety, floating population, housing security, community services, letters and visits, etc.