Current location - Trademark Inquiry Complete Network - Trademark inquiry - What is the construction price of plastic runway?
What is the construction price of plastic runway?
Generally, runways are settled by the square. Generally, there are two kinds of plastic runways, one is breathable and the other is mixed.

1. If the mixed plastic track is only made of material, it is generally around 100 yuan/square meter.

2. Generally, the price of mixed plastic runway shrinkage materials is around 160/ m2.

Extended data:

Maintain knowledge

The plastic track is beautiful and durable. If it can be maintained frequently, its service life will be greatly extended. Daily use and maintenance should pay attention to the following points:

It takes 7- 10 days to use the plastic track after it is laid.

The plastic runway is suitable for all-weather use with certain drainage facilities. Plastic track is used for athletes' training, competition, students' sports and fitness exercise, but not for other purposes.

The rubber runway should avoid the pollution of harmful substances and severe mechanical impact and friction, and vehicles are not allowed to drive on the runway and pile up heavy objects and sharp objects. Athletes must wear special sports shoes or sneakers. Dancing shoes should not exceed 12 mm, and if sports shoes have spikes, the spike length of sports shoes should not exceed 9 mm.

Pay special attention to protect the edge of the plastic runway and don't tilt at will. If the kerb is found to be damaged or blistered, the construction unit shall be informed to repair it in time to avoid more serious damage.