How to apply for building a factory on your own land?
1. site selection: select the site according to the requirements of the products produced, and consider the pollution that the production may cause to the surrounding environment.

2. Prepare the articles of association of the company and apply for a business license at the Industrial and Commercial Bureau.

3, according to the requirements of the products produced, prepare the workshop and workshop, in terms of water quality, environmental protection, environment and other aspects should meet the requirements.

4. Go to the local Bureau of Standardization and Metrology to bid for the company's commodity specifications and bid for each commodity barcode.

5. Customize trademark samples in advertising companies. Apply for trademark registration in the Trademark Office.

6. Install debugging equipment and carry out sample trial production.

7. Go to the tax department to handle tax matters.

8, packaging and material procurement, formulate internal rules and regulations, mass production.

9, the company IC planning, commodity advertising.

Process of newly-built steel structure workshop:

First of all, we should have a piece of land and make a plan according to the actual area.

Two, according to the plan factory drawings plan, report to the Planning Bureau.

Third, the land is required, and the land part must be built and given a red line.

Four, according to the plan to draw the factory building construction drawings.

Five, find the construction unit construction drawing.

Six, choose the construction unit to communicate with the planning unit.

Seven, the construction unit according to the plan pay-off and construction according to the construction drawing.

Find a qualified statement form (or registration form or statement) for environmental impact assessment of the project under construction, then submit it to the local environmental protection bureau for approval, and then register with the industrial and commercial bureau for business license.

Procedures/steps of real estate construction application

1. Register a company with the Industrial and Commercial Bureau, and pay attention to the issue of registered capital.

2. Go to the Construction Committee and the Construction Department to invite real estate talents.

3. Go to the storage base of the Land and Resources Bureau to find a clean place to recruit, shoot and hang.

4. After winning the bid, pay the transfer fee, that is, money, as required.

5. Then apply for a land certificate.

6. Plan bidding, construction scheme and drawing review.

7. After applying for the Planning Permit from the Planning Bureau,

8. Bid for the troops and go to the Construction Committee for the construction permit.

9. Pay relevant insurance and expenses. After the inspection of the line by the Planning Bureau,

Developed program

During the preliminary work:

1. Site engineering investigation (acknowledging that the investigation unit has conducted geological investigation on the site)

2, access to land use rights

3, land acquisition, demolition and resettlement

Step 4 plan

5. Implementation of development funds

6. Work out the construction plan (the construction plan includes: construction arrangement and coordination plan, building materials and equipment supply plan, construction drawing plan, infrastructure supporting contact and negotiation plan, project list and project progress plan, cash flow statement, negotiation and signing plan with contractors, etc.). )

7, the construction site leveling.

During the construction period

1, project contracting

2, the construction arrangement processing

3, project control and supervision

4. Project completion acceptance

In addition, development and application programs are generally as follows:

1, and obtain the state-owned land use certificate.

2. Plan review

3. Handling site selection opinions

4. Project establishment

5, for the construction land planning permit

6. Construction Permit (Construction Project Development Manual)

7, construction scheme declaration

8. Construction project planning permit

9, construction drawing approval