Formal meeting minutes sample
Meeting minutes are a kind of objective documentary material. Many companies will record meeting minutes. The following is a formal meeting minutes sample that I recommend to everyone. I hope you can gain something from it.
Article 1: Formal meeting minutes sample
The county magistrate presided over the 36th executive meeting of the county people's government, and conducted a special study on matters related to the construction of low-rent housing in the county.
The meeting heard a report from the County Housing and Urban-Rural Planning and Construction Bureau on the construction of low-rent housing in the county. The meeting believed that in recent years, with the strong support of the country, province and state, our county has innovative thinking and taken multiple measures to actively carry out the construction of affordable housing, mainly urban low-rent housing. Currently, 303 households are allocated to urban low-rent housing. , played an important role in solving the housing problem of low-income families with housing difficulties in cities and towns in our county, and produced good people's livelihood and social benefits. However, due to factors such as limited subsidy funds from superiors and financial constraints at the county level, the construction of low-rent housing still faces problems such as a large gap in construction funds, insufficient supporting facilities, and difficult post-management. The meeting requested that all relevant functional departments should strengthen coordination and cooperation to ensure that projects under construction are completed and put into use as soon as possible and basically solve the housing problem of low-income and disadvantaged people in urban areas.
The meeting agreed on the following matters:
First, it was agreed in principle to merge the construction and management of public rental housing and low-rent housing. County housing construction, development and reform, finance and other departments must follow the "Notice of the State Housing and Urban-Rural Planning and Construction Bureau, the State Development and Reform Commission, and the State Finance Bureau on accelerating the integrated operation of public rental housing and low-rent housing across the state" spirit, integrate low-rent housing and public rental housing construction funds, speed up the project construction progress after the merger, and ensure that the construction tasks are completed on schedule. At the same time, we must actively explore and establish practical supporting reform measures and make every effort to solve the difficulties and problems that arise in the construction of affordable housing.
Second, the county housing and construction department should comprehensively accelerate the construction progress of the fifth phase of low-rent housing after the merger, further strengthen quality supervision, improve community supporting facilities, effectively guarantee the quality of the project, and ensure that the project is completed and completed as soon as possible. put into use; it is necessary to improve the architectural style and environmental creation of the community in accordance with the overall requirements of urban planning.
Third, the county housing construction, development and reform, finance and other departments should increase their efforts to obtain and raise funds for project construction, and the county finance department should provide necessary financial guarantees when making budget arrangements. At the same time, the county housing and construction department should increase the post-management of the first, second, third and fourth phases of low-rent housing communities, strengthen the dynamic management of "access and exit" of low-rent housing communities, and at the same time explore the implementation of low-rent housing We have reformed the property rights system and worked hard to solve the construction funding gap.
Participants: County People’s Government Pu Yongfeng, Zheng Xianbin, Gao Maocai, Dou Wu, Jiang Chun, Xu Min, Ren Yi, County People’s Armed Forces Department Lu Binru, County Government Office Wenming, Bu Yunfeng, County Target Supervision Office Cao Xuefeng, County Supervision Bureau Jiang Liang, County Finance Bureau Zhao Weizhong, County Development and Reform Bureau Shan Henglu, County Housing and Urban-Rural Planning and Construction Bureau Tian Ye, County Audit Bureau Yuan Jun, County Culture, Tourism, Radio, Film, Television and Sports Bureau Ge Qiang , Wu Bangquan, County Waterworks. Part 2: Formal meeting minutes sample
The Standing Committee of the County Party Committee and the Deputy County Magistrate of the County People’s Government presided over the Yakang Expressway Construction Coordination Meeting to study matters related to the construction of the Yakang Expressway.
The meeting listened to work reports from the county high-level co-organizers, project departments of each bid section, and the towns and villages involved. The meeting pointed out that the construction of the Yakang Expressway section is under the correct leadership of the provincial and state party committees and governments, with the strong support of relevant state departments, and with the close cooperation, hard work and dedication of relevant towns, departments and participating units. , successfully completed the 2014 annual goals and tasks. In this regard, all relevant units cannot be complacent and arrogant. They must work harder, strengthen measures, seek breakthroughs, fully support and cooperate with the construction of Yakang Expressway, and contribute to the early completion and opening of Yakang Expressway. The meeting required that, first, all the towns involved should further coordinate and integrate their work forces, and focus on tackling prominent issues such as house demolition and tomb relocation to ensure the smooth progress of project construction.
Second, relevant departments at the township and county levels, owner units, construction units, etc. must scientifically coordinate and organize personnel and construction forces, further refine the implementation of responsibility goals, limit time nodes, and vigorously overcome difficulties to ensure that all tasks are completed on time. Third, all involved towns and relevant departments should increase publicity and education on policies and regulations to the masses, and actively guide the masses to understand and support highway construction. At the same time, it is necessary to combine the activities of "governing the state according to law" and "rural governance" across the state and "governing the county according to law" across the county to severely crack down on illegal activities such as blocking work and roads, and forcing contracts and contracts to create a good construction environment.
The meeting agreed on the following matters:
1. Issues regarding land acquisition and demolition.
(1) Regarding the issue of land expropriation. First, the Luqiao Town People's Government will take the lead and complete the signing of the land acquisition compensation agreement for the two households in the third group of Zanli before January 20, 2015, as well as the investigation of the temporary land for the c16-1 section and the physical indicators of the newly acquired land at the exit of the Shawan Tunnel. Work. At the same time, we took the lead in coordinating with the county forestry bureau and relevant village cadres to properly handle the dispute over the forest land boundary of the Shawan Tunnel entrance access road. Second, the Pengba Township People's Government will take the lead and start the investigation of the physical indicators of the land for the construction of the Xiaoma Chang access road before January 20, 2015, and complete the investigation of the physical indicators of the land involved in Youfang Village.
(2) Regarding the issues of house demolition and tomb relocation. First, in line with the principle of "seeking truth from facts and reasonably solving the practical problems of the masses", it was agreed in principle that the entire house of Zhou Feng, a villager in Lamasi Village, should be included in the red line of the house expropriation and demolition scope for processing. Second, the Pengba Township People's Government is responsible for completing the relocation and clearance of all houses and tombs within the red line of the Lamasery before January 30, 2015. Third, the Luqiao Town People's Government is responsible for completing the demolition of the Du Zhengliu House in Wuligou Group before January 20, 2015, and completing the demolition and clearance of the house before January 30.
(3) Regarding the demolition of houses for water and electricity resettlement of 8 households including Jia Ruilin of Wuligou Group in Tuanjie Village. The Third Immigration Working Group took the lead and cooperated with the county high-level coordinating office to clarify policy standards, strengthen personnel coordination, once again educate the people involved on policies and regulations, and complete the demolition and clearance of Jia Ruilin and Jia Ruiqiong's houses before January 20, 2015. The house clearing of all water and electricity resettled households in Wuligou Group will be completed before February 17, 2015.
(4) Regarding the issue of tomb relocation. In accordance with the principle of "putting the easy things first before the difficult ones and giving priority to meeting construction needs", the Luqiao Town People's Government is responsible for completing the relocation of 20 tombs within the scope of the Uangangping bridge approach and anchorage construction before February 17, 2015. At the same time, the people's governments of Luqiao Town and Pengba Township should strengthen their efforts, strengthen measures, and assign dedicated personnel to be responsible for the relocation of tombs. They must complete the relocation of all tombs before March 30 to ensure construction needs and ensure the orderly advancement of project construction.
(5) Regarding the issue of Yonglin combined transmission lines. In order to alleviate construction conflicts and advance project construction in an orderly manner, Yakang Company will take the lead and refer to the construction standards of steel tower construction or other similar projects in Kang and Lu counties to put forward specific implementation plans as soon as possible on related issues such as the demolition of poles and pipelines and the establishment of unit prices for pile foundations. And organize relevant departments to conduct risk assessment and submit it to the state people's government for review and approval. At the same time, the people's governments of Luqiao Town and Pengba Township must effectively coordinate the acquisition and occupation of cultivated land and forest land within their jurisdictions.
(6) Other relocation issues. First, the County High-Level Coordination Office will take the lead and coordinate with Huadian Company and the C2 Bid Section Project Department to negotiate on compensation issues for the demolition of Huadian Company’s laboratories. Second, the County High-Level Coordination Office will take the lead and coordinate the C15 Bid Project Department and Huadian Company to complete the relocation of production and domestic water pipelines for domestic hydropower immigrants. At the same time, in accordance with the principle of "following the market and seeking truth from facts" and referring to the current water price, the c16 bid section project department will compensate Huadian Company for the domestic water costs in the construction area.
2. Regarding the location of the waste slag yard
In view of the large amount of waste slag, tight construction period, and long procedure in the construction of Yakang Expressway, it is agreed in principle to adopt the "divided waste disposal method" The principle of "two steps" is used to deal with the waste residue problem.
First, Yakang Company will take the lead and follow the prescribed steps to promptly carry out the review, evaluation, demonstration and other work of the overall plan for waste slag. After the overall plan is determined, the County High-tech Coordination Office will organize on-site inspection and confirmation by professional and technical personnel from the land, water affairs, forestry and other departments. implemented later. Second, land acquisition and construction work can be started first for waste slag site selection sites with relatively mature conditions, no safety hazards, and no impact on people's production and life.
3. Other issues
(1) Regarding the wages of migrant workers. The Yakang Expressway Representative Office should strengthen the review and verification of the wages of migrant workers in the project departments of each bidding section to ensure that the wages of migrant workers are paid on time and in full.
(2) Regarding environmental protection issues. First, the project departments of each tender section must strengthen the management of construction personnel, properly dispose of production and domestic waste, and create a good construction environment. The second is to increase the dust reduction treatment during the construction process to avoid affecting the production of the masses due to construction.
(3) Regarding construction safety issues. The project departments of each bid section must attach great importance to construction quality and safety management, further strengthen the organization and management of the construction team, strictly prevent fire and safety issues in construction production, achieve scientific, orderly and civilized construction, and ensure the quality of project construction and personnel safety. Part 3: Formal meeting minutes sample
Ren Yi, deputy head of the County People’s Government, presided over a meeting to study the financing and interest discount related matters of Yihe Agricultural Ecological Development Co., Ltd.
The meeting believed that after more than two years of development, Yihe Company has adopted the model of "company + base + farmers" to develop a green and pollution-free circular economy, which will be helpful for accelerating the structural adjustment of the animal husbandry industry in our county and cultivating new high-end enterprises. The industry has played a positive role in promoting farmers to increase their income and become rich. The meeting requested that the county development and reform, finance, agriculture and animal husbandry and other departments must strictly implement the relevant regulations and requirements of the province and state on further supporting the accelerated development of small and medium-sized enterprises, increase support for small, medium and micro enterprises, and promote the good development of the county economy.
The meeting agreed on the following matters:
1. In order to support the development of enterprises and give full play to the leading role of leading enterprises, it is agreed in principle that the county finance will provide interest discounts for Yihe Company’s financing, and the discount period will be It lasts for three years, with an interest discount of 90% in the first year, a 70% interest discount in the second year, and a 50% interest discount in the third year. For specific matters involving corporate financing, Yihe Company shall negotiate with the county's domestic financial institutions in accordance with the law and credit procedures.
2. Relevant departments at the county level should increase technical guidance and support for Yihe Company, provide a good external environment for the development and growth of the company, and help the company become bigger and stronger.
3. Yihe Company must follow the requirements of "developing one side's economy and enriching one side's people", take "large-scale breeding, intensive management, and standardized production" as its thinking, and "win first, win first" With the direction of "building, enjoying and developing resources", we will comprehensively accelerate the cultivation of the Tibetan pig industry chain of "breeding pig cultivation - base construction - market sales", and strive to create a circular economy demonstration site and a highlight of modern agricultural development. Drive the surrounding people to increase their income and become rich. Article 4: Sample formal meeting minutes
Entrusted by the executive deputy head of the county people's government, Jiang Chun, deputy head of the county people's government, presided over a meeting to study the infrastructure construction project in the Anleba Machinery Factory area. matters.
The meeting believed that this project is an important project to improve the municipal infrastructure, improve flood control capabilities, and improve environmental conditions in the area. All sectors of society and the people are very concerned about it, and all departments and responsible units must strengthen their understanding. , work together to comprehensively speed up project construction, carry out high-standard and high-quality construction, and provide a satisfactory answer to the people of the county.
The meeting agreed on the following matters:
1. Issues regarding land acquisition for the construction of the project. First, the Luqiao Town People's Government will take the lead, with the cooperation of the County Land and Resources Bureau, County Municipal Administration Bureau, and County Forestry Bureau, to effectively speed up the land acquisition work and fully complete the land acquisition task for the project before March 31, 2015. At the same time, with reference to the Xincheng pension insurance standards, the application for pension insurance for farmers whose land was expropriated for this project will be started in a timely manner.
The second is the subsidy for the land acquisition personnel of the project. Before 2015, the subsidy was based on the standard of 50 yuan/person/day. After 2015, the subsidy was based on the "County People's Government's Measures for the Management of Travel Expenses of County and County-level Agencies, and County and County-level Units Going Abroad for Business (Overseas)" ) Implementation of the "Notice on the Fund Budget Management Measures", the subsidy costs will be included in the project construction funds.
2. Questions about the construction goals and tasks of the project. The Housing and Urban-Rural Development Bureau will take the lead, coordinate, cooperate and urge the construction parties. First, the Yiqiao Garden Road construction project will complete the pavement paving, curb stone installation and sidewalk smoothing before February 10, 2015, and will be fully completed by April 20, 2015; The second is the Binhe Road construction project. Before February 10, 2015, the backfill of Binhe Road will be completed to the design height of the sewage main pipe laying, and it will be fully completed by May 20, 2015. The third is the flood control embankment project. The project owner, survey and design, construction, supervision, Responsible entities such as quality supervision must perform their duties to ensure project quality and safety, complete relevant information, and start preparations for audit and acceptance of the flood control embankment project before February 18, 2015, and complete the project before April 30, 2015.
3. Regarding the issue of land expropriation on the west side of Anleba Machinery Factory. Party A and Party B negotiated and decided to abandon the expropriation of land on the west side of Anleba Machinery Factory, and signed a supplementary agreement based on the actual situation of project construction and land acquisition. The agreement was drafted by a government lawyer advisory group convened by the County Housing and Urban-Rural Development Bureau, and was agreed upon by Party A and Party B before March 15, 2015. The supplementary agreement is submitted to the government for review and approval. The agreement must specify that: after negotiation between parties A and B of the development contract, the expropriation of 13,000 square meters of land on the west side of the Anleba Machinery Factory will be waived; Article 18 of the investment contract involving the repurchase payment shall be adjusted and improved accordingly. ; Clarify the repurchase period and proportion adjustment of Yiqiao Garden Road and Binhe Road.
4. Issues regarding the funding of the project. First, considering that the Yiqiao Garden Road Project and the Flood Control Embankment Project have been completed 90% and 95% respectively, and the development company also needs to cash in wages and material payments for migrant workers before the Spring Festival, it agrees to pay the investor (Dingjia Real Estate Development) before February 18, 2015. Co., Ltd.) paid 3 million yuan for the land and 1.5 million yuan for the Yiqiao Garden Road construction project. It was agreed that Dingjia Real Estate Development Co., Ltd. would use the 1 million yuan paid deposit for migrant workers’ wages to cash in the wages of migrant workers. Dingjia Real Estate Development Co., Ltd. The company has made a commitment not to make corresponding claims for contract performance due to land expropriation issues. The Housing and Urban-Rural Development Bureau will handle payment matters in accordance with relevant fiscal policy requirements to ensure that the project does not default on the wages of migrant workers and maintain social stability and unity. Second, in order to solve the funding problem of the project, it was agreed to adjust the Garden City shantytown reconstruction infrastructure supporting project to the Anleba area for implementation as a shantytown infrastructure project. The County Housing and Urban-Rural Development Bureau continues to work hard to secure subsidies for shantytown renovation for Anleba infrastructure construction. The Water Conservancy Bureau has done a good job in securing flood control embankment projects, speeding up the implementation of project funds, and coordinating the use of Anleba infrastructure construction.
5. Issues regarding other aspects of the project construction. First, the County Audit Bureau will do a good job in tracking and auditing the project in accordance with the requirements of the "Minutes of the Meeting to Study Matters Related to the Renovation of the Anleba Area". Second, the county public security bureau will severely crack down on illegal activities such as illegal blocking of work and roads, unreasonable troubles, and even extortion. The third is to consider the actual needs of the project acceptance, repurchase and other work, and hire lawyer consultants to intervene in the later work. The Housing and Urban-Rural Development Bureau will form a report hiring Zhigao Law Firm as a lawyer advisory group and submit it to the county government. The relevant costs will be included in the project construction funds. List of items. Article 5: Formal meeting minutes sample
The deputy county magistrate of the government hosted an on-site office meeting in Tianba Township to study matters related to the construction of case handling points of the Xincheng Prefecture Discipline Inspection and Supervision Bureau. The deputy secretary of the State Commission for Discipline Inspection and the heads of relevant county departments and Tianba Township attended the meeting.
The meeting listened to reports on the construction of the new city and studied the issues such as site cleaning and construction electricity (water) faced by the construction of the case handling point of the State Discipline Inspection and Supervision Bureau. The meeting requested that all relevant departments and Tianba Township should take multiple measures to step up work to ensure the smooth implementation of the construction of case handling points of the State Discipline Inspection and Supervision Bureau.
The meeting agreed on the following matters:
1. Regarding the coordination and cooperation of the project
In order to comprehensively speed up the construction process of the case handling point of the State Discipline Inspection and Supervision Bureau, ensure that it is completed on schedule and Put into use, in accordance with the instructions of the main leaders of the county party committee, the establishment of the county was led by Comrade Dou Wu, deputy head of the county government, Jiang Liang of the County Supervision Bureau, Liu Weihong of the County Development and Reform Bureau, Gao Defu of the County Land and Resources Bureau, Peng Lin of the County Housing and Urban-Rural Development Bureau, and County Environmental Protection Bureau Bureau Du Yan, County Water Bureau Ren Chaoli, County Work Safety Bureau Ren Xingping, County Poverty Alleviation and Immigration Bureau Wang Huan, Xincheng Management Committee Peng Yong, County Fire Brigade He Yong, County Power Supply Company Huang Yong, Tianba Township Qiang Qiuming and others are members. The State Commission for Discipline Inspection and Supervision Bureau coordinates the construction of case handling points to coordinate the working group to ensure the smooth progress of the construction of case handling points. Departments handling project requirements such as development and reform, environmental protection, land, housing, water affairs, safety supervision, and fire protection must open "green channels" to standardize and efficiently complete relevant procedures. Relevant departments, towns, and village groups must pay attention to the entire process and participate in the project. Construction, proactively solve problems and difficulties encountered during project implementation.
2. Issues related to three links and one equality
The new city management committee will determine the scope of construction land and be responsible for coordinating the construction of access roads; the county Poverty Alleviation and Immigration Bureau is responsible for coordinating the construction scope For the relocation of water pipes of the 15th Bureau of China Railway and the provision of production and domestic water for the case handling points of the State Discipline Inspection and Supervision Bureau, the relevant relocation plans and costs are reported to the Management Committee; the project contractor must clarify the construction power load demand as soon as possible, and in principle, adopt The solution is to turn off the power supply of the transformer in the hydropower resettlement site. The county Poverty Alleviation and Immigration Bureau is responsible for coordinating and implementing the issue of electricity consumption for project construction; Tianba Township is responsible for determining the relocation plan and budget for water canals, power lines, etc. owned by rural households within the construction scope, and submitting it to the Management Committee for approval. Implementation; Provincial Jiang'an County Transportation Construction Co., Ltd. is responsible for determining the site clearance plan and budget, and Tianba Township is responsible for organizing the implementation, but it must ensure that geological survey and construction operations are carried out on schedule. Chapter 6: Formal meeting minutes sample
The Standing Committee of the County Party Committee and the Deputy County Magistrate of the County People’s Government presided over a meeting to study matters related to the relocation and construction of the Yonglin Integrated Transmission Line of the Yakang Expressway.
The meeting heard the relevant responsible persons from the County Coordinating Office, Luqiao Town Government, Pengba Township Government, Yakang Company Representative Office, Electric Power Construction Company, etc. Reported on work status and conducted research on related issues.
The meeting agreed on the following matters.
1. Regarding the issue of tower base compensation standards. First, it is agreed in principle that the main tower base should be extended by 2 meters to the four sides. The compensation standards for land acquisition and demolition involved are strictly in accordance with the Yakang Expressway land acquisition standards (cultivated land: 40,750 yuan/mu, converted farmland, forest land, and self-retained hills: 20,375 yuan/mu). Second, the temporary land used for tower foundation construction will be settled at 300 yuan per tower, the temporarily occupied cultivated land will be compensated at the standard of 2,250 yuan/mu, and the occupation of converted farmland, forestland, and self-retained hills will be compensated at the standard of 1,125 yuan/mu. Third, farmland and young crops will be compensated at the standard of 1,400 yuan/mu, and farmland, woodland, and self-retained hills will be compensated at the standard of 10,000 yuan/mu for ground crops, excluding any economic trees.
2. Regarding issues not covered by the policy. Led by the County High-Level Coordination Office, with the cooperation of Yakang Company Representative Office, Electric Power Construction Company (hereinafter referred to as the construction unit), Luqiao Town Government, and Pengba Township Government, we went to the site to conduct on-site surveys of the land involved in the construction of the road crossing. In the spirit of seeking truth from facts In accordance with the principle, compensation will only be provided where appropriate for farmers who have retained their own hills and converted farmland into forests. No compensation will be given for crossing collective cultivated land, forestry land, abandoned farmland, roads, etc. during construction, and the compensation for crossing by construction roads cannot exceed one-third of the total compensation for the tower base.
3. Regarding the issue of migrant workers. The construction unit shall reasonably solve the problem of migrant workers based on the construction situation of the construction site. The special areas involved (except for collective barren hills and slopes) will be handed over to the township (town) organization for implementation according to the design budget price, ensuring quality, construction period, and subject to unified management.
4. Regarding issues such as the distance between lines and houses. The construction unit must provide relevant industry specifications and standards and other basis, and hand them over to the township for publicity, and jointly explain and guide the work.
5. Regarding construction environmental issues. The Luqiao Town Government, Pengba Township Government, township police stations and village groups should further increase publicity for the construction of Yakang Expressway. At the same time, illegal behaviors such as making trouble, causing trouble, and illegally blocking work must be severely dealt with in accordance with the law. Part 7: Formal meeting minutes sample
The meeting heard a report on the construction status of the Erlang Mountain Forest Area Highway Project and made arrangements for related work.
The meeting agreed on the following matters:
1. The Erlang Mountain Forest Road Project is a key post-disaster recovery and reconstruction project of the "4.20" Lushan Earthquake. The original design standard was a one-way road in the forest area, and the traffic standards Low and unreasonable alignment. In view of the fact that this section has been included in the construction plan of Provincial Highway 433 and the road construction plan for the development of Niubei Mountain Tourist Scenic Area, in order to avoid duplication of investment and major waste, it is also to effectively improve people’s travel ability and promote the development of the tourism industry. , give full play to the project's financial benefits, and after collective research, it was agreed in principle to adjust and change the Erlang Mountain Forest District Highway Project design plan in accordance with the principle of "the total amount of project construction funds remains unchanged, and how much money is spent to build as many roads as possible", and the original design will be 4.5 meters wide. The construction of forest roads has been changed to be constructed according to the standards of Class IV highways.
2. The change procedures for the Erlang Mountain Forest Area Highway Project must be strictly implemented in accordance with the "4.20" Lushan Earthquake Post-Disaster Recovery and Reconstruction Project Policies. The project owner unit and the Project Promotion Center must promptly carry out relevant procedures. The County Reconstruction Office, The development and reform, transportation, auditing and other industry authorities must follow the principle of special handling of special cases and special handling of special problems, fully support and cooperate with the project changes, and complete the design changes before May 12.
3. The design changes of the highway project in Erlang Mountain Forest Area must be adjusted on the original road subgrade. No major route changes or increases in engineering volume will be made. The survey and design unit must complete the survey and design work before April 25.
4. After the design change of the Erlang Mountain Forest Area Highway Project, the unit price of the project will be constructed according to the total construction cost controlled within 5 million yuan. The construction units that have won the bid must strictly carry out construction in accordance with relevant quality standards and strive to achieve 8 The project construction will be completed before May 20th. The design, supervision and other costs of project changes shall be paid out of the remaining construction funds of the project, and relevant units must charge fees in strict accordance with industry standards. The amount of work produced before the project design change is involved will be calculated in the total cost of the winning construction bid.
5. The county transportation department should think forward and effectively strengthen the connection with the provincial and state authorities. Combined with the provincial highway 433 planning, actively do a good job in docking road planning and construction and securing security facility projects. The People's Government of Lengqi Town and the project owner must do their best to coordinate services and strictly prohibit illegal blocking of work and roads. Construction units must firmly establish awareness of production safety, establish and improve a supervision system, and set up safety signs to ensure the safety of passing vehicles and pedestrians.
6. All relevant units should attach great importance to it, fully understand the importance of post-disaster recovery and reconstruction project construction, effectively strengthen project supervision, pay close attention to work implementation, and quickly promote project construction. The person in charge of the unit who shirks his duties and shirks his responsibilities, causing the project construction progress to lag behind, will be strictly held accountable. ;