Floor tile contract

With the general improvement of the legal awareness of the general public, contracts appear more and more often in our lives. Signing a contract is also one of the best ways to avoid disputes. So what should you pay attention to when drafting a contract? The following are floor tile contract templates that I have collected for everyone. You are welcome to read them. I hope you will like them. Floor tile contract template 1

Party A:

Party B:

In order to clarify the rights, obligations and responsibilities of both parties during the construction process, we follow the principle of equality, voluntariness, Based on the principle of honesty and trustworthiness, both parties reached consensus on the pasting of wall and floor tiles in this project and entered into this contract.

1. Project Overview

1. Project Name: Building 12#, Phase 3, Jiagang Resettlement Community

2. Project Location: Jinshui East Road Intersection 500 meters east of 107 Auxiliary Road

3. Project content and requirements: Construction will be carried out in accordance with design drawings, national specifications, and relevant atlases, including wall and floor tiles for all kitchens and bathrooms.

2. Contracting methods:

Party B shall contract for quality, safe and civilized construction, construction period, acceptance and other contracting methods (the construction period must unconditionally meet Party A’s overall construction schedule) .

3. Settlement price:

According to the agreement between the two parties, the wall tiles are priced at RMB/㎡ and the floor tiles at RMB/㎡, calculated based on the actual area. After the construction of the fifth floor is completed, 50,000 yuan will be paid for living expenses; 65% will be paid after the engineering department, supervision department, and Huayue project department pass the acceptance inspection, and 85% will be paid after the five major responsible persons pass the acceptance inspection; 95% will be paid after the house is delivered, and the remaining 5% will be paid. All payments will be made after the warranty period expires. (With big contract).

IV. Contract duration:

The total contract duration is 30 calendar days, starting from the entry time that Party A notifies Party B to negotiate and determine.

5. Quality standards:

1. Wall tiles: Wall tiles must be firmly laid and free from defects such as skew, hollows, chipping, falling corners and cracks. The basic items are as follows:

A. Surface: smooth, clean, with dense joints.

B. Joints: The filling is dense and straight, the width and width are consistent, the bricks at the inner corners are pressed in the correct direction, the use part of the non-whole bricks is suitable, and the outer corners are cut at a 45° bevel and the joints are tight.

C. Overlay cutting: use whole bricks to cut and match, with neat edges; the thickness of wall skirts, facings and other protruding walls should be consistent.

D. The allowable deviations of quality standards are as follows:

2. Floor tiles: The combination of the surface layer and the base layer must be firm and without hollows. The surface is clean, the pattern is clear, the color is consistent, the seams are evenly rubbed, the periphery is smooth, and the plate has no defects such as cracks, corners, or missing edges. The slope of the ground flooding meets the design and specification requirements, and there is no reverse slope. The whole bricks at the floor drain are cut closely and neatly, and the edges are neat. The allowable deviations of the quality standards are as follows:

Note: Protective measures for the bathroom waterproof layer must be taken before construction, and a second water closure test should be done after completion to prevent Cause damage and check the construction effect.

6. Responsibilities and obligations of both parties:

Responsibilities and obligations of Party A:

1. Provide Party B with tools and processing space in the construction area.

2. Provide Party B with a working surface.

3. Reasonably arrange the construction sequence. If there are any design changes, Party B should be notified in time.

4. Party A has the right to supervise and inspect Party B’s project quality during the construction process, and if any problems are found, require Party B to make rectifications within a time limit.

Party B’s responsibilities and obligations:

1. Party B must carry out construction in accordance with the construction plan and technical explanation. The wall brick mortar ratio is strictly controlled to be 1:1, and the floor tile leveling layer is 1:1. 4. If the cement usage exceeds the budgeted usage by more than 1%, Party B will bear the cost.

2. According to Party A’s construction period requirements, cooperate with other units in construction to ensure the overall progress of the construction.

3. Party B should conduct civilized construction on site and clean up the site after completion. At the same time, other finished product protection work should also be done during the construction. If any damage is caused to the latex paint, floor tiles, elevators, doors, windows and other completed projects in the public area, Party B will be responsible for all maintenance work and costs.

4. Party B must do a good job in safety protection measures and quality management, and arrange dedicated personnel on site to be responsible for safety and quality work. If any safety accidents are involved, Party B will be responsible for them; if any quality issues during the construction process are reported by the superior department The fine shall be borne by Party B.

5. Party B will be responsible for the temporary accommodation and food of Party B’s construction workers. Pay attention to saving materials during the construction process. Party B will be responsible for any fines caused by the superior department due to random waste.

6. Party B shall take good care of the materials, tools and mechanical equipment brought in. Party B shall be responsible for any loss.

7. Wear safety protective equipment correctly when entering the site, otherwise Party A and the supervisor will be liable for fines for safe and civilized construction. All construction workers are educated to pay attention to hygiene. If defecation is found in the building, they will be fined 300 yuan each time, which will be shared among each team.

7. Warranty Responsibilities:

During the warranty period, if any project quality problems occur, Party B shall come to repair it free of charge within 48 hours after receiving Party A’s notice. or quality problems caused by technical factors of civil engineering (not Party B's responsibility), Party B shall carry out maintenance according to the foregoing of this article. Party A shall pay the maintenance fee to Party B according to the actual business. After the warranty period expires, if quality problems occur, Party B shall promptly send personnel to repair them. If it is qualified, it shall not be refused or delayed, otherwise Party A has the right to recover Party B's maintenance costs.

8. Other unfinished matters or incomplete parts of the contract can be supplemented by agreement between the two parties, and the supplement will be effective at the same time as the contract.

9. Liability for breach of contract:

1. If the quality is lower than the model room standard, it will be deemed unqualified and the price will be deducted by 2 yuan per square meter;

2 , if there are other breaches of contract, the responsible party shall bear approximately 5,000 yuan in breach of contract and other construction period losses.

10. Warranty period: 1 year, starting from the time of delivery.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day Contract template for laying floor tiles 2

Party A (full name):

Party B ( Full name):

After negotiation between Party A and Party B, Party A subcontracts XX’s bathroom wall tiles, floor tiles, stair tread tiles and foyer wall and floor tiles to Party B for construction. In order to clarify the responsibilities, rights and interests of Party A and Party B, and to ensure the quality, progress, safety and civilized production of the project, this contract is entered into for Party A and Party B to mutually abide by and implement.

1. Project Overview

Project Name: XX

Scope of Work: Bathroom wall tiles, floor tiles, stair tread tiles and foyer wall and floor tile paving sub-projects

Construction period: X, month, X, year to X, month, X, year : Including cleaning of the base layer, material transportation, jointing, door stone installation, and baseboard installation; the settlement method is: calculation and settlement based on the actual completed area on site.

2. Contract price:

1 Unit price of wall tiles: Yuan/㎡ 2 Unit price of bathroom floor tiles: Yuan/㎡

3 Unit price of floor tiles: Yuan/ Unit price of 4 square meters foyer wall and floor tiles: Yuan/㎡

Unit price of 5 stair treads and platform tiles: Yuan/㎡

(The above floor tiles include skirting, and the area is not calculated separately. )

3. Review and payment of project funds

1. Party B applies to Party A for borrowing living expenses based on the actual completion of the project;

2. After Party B completes the project , Party A will pay 80% of the total project price upon passing the preliminary inspection, and 95% of the total project price will be paid after the owner passes the acceptance inspection. The balance is quality warranty money, which will be paid in one lump sum one year after the completion acceptance.

3. Party B shall provide Party A with a 2-year quality assurance commitment letter. If there is a quality problem and Party A notifies it, Party B shall rush to the site for repair within 24 hours after receiving the notification.

4. 4. Responsibilities and rights of Party A and Party B

1. Party A has management personnel responsible for preparing progress plans and construction plans, supplying and dispatching materials and equipment, and conducting construction safety technical briefings in a timely manner;

p>

2. Party A is responsible for providing Party B with construction sites and other convenient conditions for construction operations; 3. Party B must organize construction according to the construction tasks and technical requirements provided by Party A, and Party B’s construction personnel should meet Party A’s reasonable progress Arrangements;

4. Party B shall prepare its own tools required for construction, and shall be obliged to actively cooperate with other cross-construction teams;

5. Party B shall consciously take care of Party A’s construction site Party B is responsible for the machinery and equipment within the team and protecting the products, semi-finished products and other labor results of this team and other teams. If there is any damage, they will be held responsible. The site must be cleaned up in time after the work is completed;

6. Party B Must obey Party A's management personnel's arrangements in safety, technology, progress, quality, materials, labor force, civilized construction and other aspects to ensure that the work is completed and the factory is clean; if Party B refuses or ignores Party A's management of the above requirements, Party A may arrange for others to It will be completed separately and the cost will be borne by Party B.

V. Construction Period, Quality and Safety Production

1. The construction period of this project is to be fully completed before XX, XX, month XX, XX, if Party B’s labor force is insufficient

If factors such as poor organization and poor organization affect the construction period, Party A may impose financial penalties;

2. Party B must ensure that the quality of the project reaches qualified standards. If Party B encounters quality problems during the construction process, Party B will be free of charge except for rework and rectification and compensation for materials. In addition to losses, Party A also has the right to impose economic sanctions. If a major quality accident occurs, Party A has the right to cancel the contract and not settle the completed work quantity of Party B in order to compensate for the loss;

3. During the construction process, Party B shall accept inspection by Party A at any time and discover any If the quality does not meet the requirements, it should be reworked and rectified immediately;

4. Party B should effectively strengthen production safety management to ensure that Party A’s safety production responsibility objectives are met, otherwise Party A has the right to impose penalties in accordance with relevant regulations.

6. Unsettled matters: Unsettled matters in the contract shall be resolved through negotiation between the two parties.

7. Number of Contract Copies: This contract is made in two copies, with Party A and Party B each holding one copy. It has the same legal effect and will take effect after the signature of Party A and Party B. It will automatically expire after the project is completed and the settlement payment is settled.

Party A (seal): Party B (seal):

Signature of the representative: Signature of the representative:

Date: Date:

Contact information: Contact information: Floor tile contract template 3

Party A:

Party B:

Party A and Party B agree on the ceramic tiles and floor tiles in the Jewelry City Processing Zone For purchase and sale matters, the contract signed by both parties is as follows:

1. Product name, specifications, manufacturer, quantity, amount, and delivery time:

(1) Name of supply: Ceramic tiles, floor tiles;

(2) Brand and trademark: Jiren Ceramics

(3) Specifications and models: Ceramic tiles: 250mm*330mm Floor tiles: 330mm*330mm;

(4) Manufacturer: Foshan, Guangdong

(5) Quantity: 250mm*330mm: 1550m2; 330mm*330mm: 810m2

(6) Unit price of supply: 250mm*330mm: 1.80 yuan; 330mm*330mm: 2.20 yuan.

(7) Delivery time: Delivery at any time according to Party A’s requirements.

2. Quality requirements and technical standards:

(1) The objects Party B must provide are high-quality products;

(2) Party B must comply with the requirements already provided to Party A's sample supply;

(3) Party B is required to provide corresponding batches of warranty certificates with the goods;

(4) Party A's responsibility for the batches of ceramic tiles and floor tiles supplied by Party B Carry out spot inspection and retest, Party A can carry out construction at the same time, if the retest fails, Party B must unconditionally return the remaining ceramic tiles and floor tiles constructed by Party A, and bear the cost of the retest as well as the cost of the ceramic tiles and floor tiles materials that have been used and related losses;

(5) Party A’s random inspection of ceramic tiles and floor tiles does not exempt Party B from responsibility for the quality of the materials supplied.

3. Transportation method and delivery location: Party B delivers goods to Party A’s construction site (Yangzhou Jewelry City Processing Zone Construction Site), the construction site designated by Party A.

4. Unloading the truck and bearing the costs: Party B will unload the truck by himself and bear the corresponding expenses.

5. Party A accepts ceramic tiles and floor tiles as finished products. Party A is not responsible for any losses (if defects or cracks occur during unloading, Party A will return this part of the goods if they are shoddy).

6. Settlement method and term: Party B shall pay 50% of the total bid amount after the goods arrive at the site and are unloaded at the location designated by Party A, and the balance shall be paid at the end of June.

7. When collecting each payment, Party B must provide the corresponding quantity of material invoices.

8. Liability for breach of contract: If Party B is unable to supply the goods in time or cannot continue, Party A has the right to refuse to pay the balance of the payment for the goods supplied. If Party A cannot pay the payment within the agreed time, Party B has the right to hold Party A accountable. . If one party breaches the contract, it shall bear the economic losses caused to the other party.

9. For matters not yet discussed, the two parties will negotiate separately.

10. This Agreement is made in duplicate, with each party holding one copy.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day Contract template for laying floor tiles 4

Party A:

Party B:

In order to ensure the safe production, civilized construction, quality, progress and smooth progress of various constructions of this project, in accordance with relevant laws and administrative regulations and following the principles of equality, voluntariness, fairness, mutual benefit and good faith, Party A will document The parking lot tiling work of the comprehensive improvement project of the street and community is contracted to Party B. In order to clarify the responsibilities, rights and obligations of Party A and Party B, this contract has been entered into by Party A and Party B through consultation and in order to ensure mutual compliance. The specific terms are as follows:

1. Contract content and unit price

Parking lot tile price RMB per square meter

2. Contracting method

2. Quality requirements

1. Party B guarantees that the construction will be carried out in accordance with the design requirements, current relevant standards, technical regulations and Party A's requirements for the paving work of this project. It is strictly prohibited to carry out construction in violation of regulations, otherwise, due to Party B's reasons, Party B will be responsible for all quality problems and the resulting impacts and losses. Party A will have the right to unilaterally impose financial penalties and loss compensation on Party B depending on the losses and construction delays of the project.

2. Party B’s construction quality of this project must meet the design, specification and quality inspection and assessment standards.

3. Construction period: year month day to year month day

4. Payment method

5. Others

1. This Any matters not covered in the contract or disputes during construction shall be resolved through negotiation between the two parties.

2. This contract will come into effect after the signature or seal of the economic responsible parties of both parties. It will automatically expire after the work within the scope of the project contract is completed and the project payment is settled.

3. This contract is made in two copies, with Party A and Party B each holding one copy.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_______year____month____day