Construction Project Agreement Part 1
Construction Project All-Risks Insurance Policy No. This insurance policy shall be filled out and signed by the policy holder truthfully and in as much detail as possible as a document to the company. The basis for insuring construction projects against all risks. This insurance policy forms an integral part of the project insurance policy.
1. Name and address of project related parties
Project owner, contractor, project subcontractor and other relationships
2. Name and address of the insured:
3. Name of the insured project
4. Location of the insured project
5. Insured items, insurance amount/limit of compensation and deductible for each accident Amount
5.1 Insured amount for material damage items Deductible amount per accident
Construction projects (including permanent and temporary projects and materials used)
(1) Project Contract price
(2) Materials or equipment installation items provided by the project owner
Each accident refers to an accident or a series of accidents caused by an event
Construction machinery and equipment (see attached list for details): debris removal costs, fire extinguishing costs, professional fees, other costs, total insurance amount
5.2 Special hazard compensation limit
Hazard Type compensation limit (not exceeding 80% of the insured amount)
Deductible for each accident of earthquake, tsunami, flood, storm, and heavy rain (not less than 20% of the loss)
5.3 Rate
5.4 Total insurance premium
6. Insurance period
6.1 Construction period: ______ months, starting from ____year__month__ Starting from the date of ____year__month__day, including the trial period of __ days
6.2 Limited liability warranty period: months, starting from the date of year and month to the date of year and month ( Must be consistent with the warranty period stipulated in the project contract)
7. Whether third-party liability is insured
If yes, please specify: ___________
7.1 Each accident Compensation limit
7.2 Cumulative compensation limit
7.3 Deductible for material losses per accident
7.4 Rates and insurance premiums
8 . Engineering
8.1 Construction area, height, underground construction depth, span, number of floors, building structure, building materials
Construction machinery and equipment (see attached list for details): Clear Debris costs, fire extinguishing costs, professional fees, other costs, total insurance amount
9. Whether any of the parties involved in the project has purchased insurance related to this project from other insurance companies
Insurance company____________Insurance type____________Insurance amount____________
10. Special terms
11. Remarks
Please provide the following along with this insurance policy Documents
(1) Project contract
(2) Detailed list of insured amounts
(3) Project design document
(4) Project schedule
(5) Engineering geology report
(6) Construction site overview
The policyholder and the insured hereby declare that the above information filled in is true. I have understood your company's explanation of the all-risks clause and additional content (including the liability exemption part) of the installation project, and agree to insure the installation project against all risks in accordance with the clauses and additional content.
Insurant and insured (signature and seal)_______________
Telephone_______________
Address_______________
Date_______________
p>
The following content shall be filled in by the insurance company:
Person in charge and date ____________________
Underwriter and date ____________________ Construction Project Agreement Part 2
Contract issuing party (hereinafter referred to as Party A):
ID number:
Contractor (hereinafter referred to as Party B):
Legal representative: < /p>
ID number:
Party A now has an original ____-story building at Village Street and Lane No., Party B has entrusted Party B with its construction. Party A takes the form of a large contract, that is, contracting work and building materials. In order to ensure quality and complete tasks on time, Party A and Party B have reached the following agreement on relevant specific matters:
The terms of this contract are based on the principles of fairness and justice. Both parties fully negotiated and reached an agreement and signed this contract. Both parties must strictly comply with the implementation.
1. Project name: Party A’s private residence addition.
2. Project location: _______________.
3. Project deadline: from ____ month ___ to _____ year ____ month ___, ***_____ days.
IV. Project price negotiation: RMB____ million yuan.
5. Contracting method: Party B undertakes Party A’s floor addition project in the form of labor and materials contracting. Party B fully contracts the labor and materials, including formwork, roof frame, exterior wall grates, construction machinery, iron and steel. Nails, wires, cable ties, surrounding colored strips, other detailing tools and all construction materials.
6. Project content: According to the requirements of Party A and the existing model, an additional ____ floor will be built on the ____ building.
The cement used in building the house is ______, the floor is made of reinforced concrete, and there are ____ beams in the interior. The location is arranged by the landlord. The floor height is 3 meters. Use ____ bricks, dust the wall twice, and stick ________ bricks. There are ______ windows____ on the east side, the specific locations will be arranged by the landlord. Paste 200×300 ceramic tiles on the walls of toilets, kitchens and balconies to the top of the walls, and paste 300×300 anti-slip tiles on the floor. Install stainless steel doors in the toilet and kitchen, leave a window in each, build a toilet seat and a stainless steel wash basin, and prepare drainage and sewage pipes. The water pipe material is Liansu. The window material is Dongjiang aluminum, and the anti-theft net is Yuanhang stainless steel, with a height of ____cm.
The above-mentioned materials must be of high quality. After construction is completed, Party B must ensure good hygiene in and around the house, as well as fire prevention and theft prevention. Make sure the place is clear when people are walking around.
7. Party B must ensure quality when building a house. If there are any non-compliance with quality issues and require rework, Party B will be responsible for the waste caused and the cost of rework.
8. Party B must take safety measures during the construction period. Due to its own ineffective safety measures, it is responsible for the accident and the resulting expenses. If a casualty accident is not caused by Party B, the responsible party shall bear the relevant expenses; if Party B causes damage to the neighbor's house, Party B shall be responsible for it.
9. If there is interference from urban management, which affects Party B’s construction, Party A will be responsible for the damaged building materials according to the current cost. In addition, if the construction content needs to be modified or additional engineering items must be discussed with Party A, both parties must reach an agreement to respect each other and successfully complete the construction task.
10. After Party B enters the site, Party A is responsible for the water and electricity used for construction and ensures that the construction site has water and electricity. After the house is built, Party A is responsible for all water and electricity installation, including water and electricity materials.
11. Payment method: All payments must be made within one week after completion.
12. This contract will come into effect after being confirmed by both parties, and both parties must strictly abide by it.
13. This contract is made in ____ copies. Party A and Party B each hold ____ copies. They have the same legal effect. Matters not covered need to be negotiated by both parties. They can be made after consensus. Additional provisions. After the project payment is settled and paid, this contract will be automatically terminated and invalid.
Contractor:
____year___month___day
Contractor:
Legal representative: < /p>
____Year___Month___ Construction Project Agreement Part 3
Project Name: Panyu District Shiqiao Xihuan Crown Cake Shop Complex Building 1, Factory Building 2, Factory Building 3
Party A: Crown Cake Shop, Shiqiao Xihuan, Panyu District, Guangzhou
Party B: The Fifth Construction Engineering Company of Panyu District, Guangzhou
According to "Guangzhou The requirements are stipulated in the "Municipal Measures for the Administration of Safety Production Measures Fees for Construction Projects". After negotiation between the two parties, the following agreement has been reached on the construction safety production measures fees for this project. Both parties shall abide by it and shall serve as a supplement to the project construction contract.
1. Responsibilities of both parties: Party A and Party B *** mutually abide by the "Guangzhou Construction Engineering Safety Production Measures Fee Management Measures" and implement them in accordance with its contents.
2. According to the content of the document, Party A is required to allocate the safety measures fee to Party B for its exclusive use, so as to comply with the requirements of the "Guangzhou Construction Engineering Safety Production Measures Fee Management Measures".
3. According to the requirements of the document, Party A pays Party B the production safety measure fee of 1.22% of the project cost, totaling: 145,500 yuan.
IV. Payment Plan Requirements for Safety Measure Fees
(1) After review by the relevant departments, 30% should be paid if the construction conditions are met
(2) Relevant departments will pay 60% after passing the intermediate safety evaluation
(3) 10% will be paid after passing the safety evaluation at completion of the project
5. Liability for breach of contract:
( 1) If Party A fails to pay or fails to pay the safety production measure fee in time, causing the safety supervision agency to punish Party B's enterprise and cause losses to the enterprise's reputation, and fails to apply for the construction permit, Party B has the right to recover the losses caused by Party A and make amends.
(2) If, due to Party B’s reasons, the project construction safety production measure fee is withdrawn and fails to meet the relevant regulations of the safety supervision agency, Party B shall be responsible.
6. The above terms and conditions must be abided by. Unfinished matters will be resolved through negotiation between the two parties.
Party A:
Party B:
(Official seal)
(Official seal)
Representative: Representative:
Date: Year, Month, Day
Date: Year, Month, Day Construction Project Agreement Part 4
Party A:
Party B: < /p>
In order to effectively strengthen production safety management and clarify responsibilities, after negotiation between Party A and Party B, they have unanimously agreed to enter into this agreement and shall abide by it together.
1. Responsibilities of Party A:
1. According to the relevant documents of the government authorities and the company’s relevant systems, formulate corresponding rules and regulations, and promptly convey them to the project department to actively guide Party B Carry out safety publicity work.
2. Timely convey and explain the relevant requirements for safe production, civilized construction, and environmental protection to Party B, and supervise and inspect Party B's implementation. Party B has the right to order rectification where Party B fails to implement or has incomplete implementation.
2. Responsibilities and obligations of Party B
1. Party B should actively carry out safety publicity work and organize all construction personnel to conduct safety briefing education before construction.
2. Party B shall formulate detailed rules for safe production, civilized construction, and environmental protection applicable to this project, and implement them conscientiously.
3. Obey Party A’s management, take the guidance and inspections of Party A and the competent authorities seriously, and promptly rectify existing problems.
4. Everyone in the project department management staff is responsible for safe production, civilized construction, and environmental protection. In particular, full-time safety officers must strengthen their sense of responsibility and improve their own quality. The project manager should actively cooperate The job of a security officer.
5. Strengthen safety management, establish a safety production responsibility system and safety inspection system, formulate safety production plans, and ensure safe production.
6. Establish safety production goals: ensure that there are no major casualties in the project, eliminate fatal accidents, control serious injury accidents within 20,000, control work-related injury accidents at zero, and control general accidents within the scope of national regulations .
7. If a work-related injury accident occurs, it should be reported immediately to the project department and project leader, and to the company in a timely manner. It should be properly handled with the guidance and help of the company and the project department, and the company should bear the responsibility for the accident.
8. This agreement is made in triplicate, one copy each for Party A and Party B and Party A’s Engineering Department.
Party A: Party B:
Representative: Representative:
Year, Month, Day Construction Project Agreement Part 5
Agreement Number: LCXMB (Jianshean) Word (20xx)-1
Project name: **Lead Mine Workers Residential Community 1 Group House Construction Project
Management Unit (Party A): China Railway Eighth Bureau* *Lead Mine Project Department
Construction unit (Party B): Sichuan Changyang Construction Engineering Co., Ltd. (Bai Jixue Construction Team)
Signing location: China Railway No. 8 Bureau ** Lead Mine Project Ministry Office
Signing time:
Project Construction Safety Agreement Terms
Agreement Name: **Lead Mine Workers Residential Community Group 1 Housing Construction Project Safety Agreement
p>Management unit (Party A): China Railway Eighth Bureau ** Lead Mine Project Department
Construction unit (Party B): Sichuan Changyang Construction Engineering Co., Ltd. (Bai Jixue Construction Team)
p>
In accordance with the safety management provisions of the company's "Safety Production Environment Management Control Measures" and combined with the specific conditions of this project, in order to ensure safety during the construction process, the two parties have reached the following agreement.
1. Project Overview
1.1 Project Name:
1.2 Project Location:
1.3 Main Project Content: **Lead Mine Workers Residential complex 1 group engineering and temporary facilities, safe and civilized construction, loading and unloading of construction materials and supplies, operation and maintenance of construction machinery, etc.
1.4 Planned start date: August 27, 20xx
1.5 Planned completion date: All construction personnel will leave after the project is completed
2. Construction unit (Party B) Responsibilities and obligations
2.1 Construction safety responsibility area (scope): the entire construction site; various construction materials and material production and storage sites; the sidewalk outside the construction wall; the construction unit (Party B) guarantees Carry out construction operations within this area (range) and be fully responsible for construction safety.
2.2 Establish and improve the construction safety assurance system and implement a level-by-level safety responsibility system. The person in charge of construction safety of this project is fully responsible for the construction safety of this project. The person in charge of project site safety is resident at the construction site. , responsible for safety management during on-site construction.
2.3 Combined with the nature and characteristics of this project, the safety precautions to ensure safety include the safe use of on-site construction personnel, mechanical equipment and facilities, and the safety of surrounding vehicles and pedestrians. The main safety precautions are to implement the "Safety Production Law", establish a safety guarantee system, set up full-time safety officers, implement the safety production responsibility system, strictly implement safety measures and safe operating procedures, and conduct safety education and training for construction personnel. Double rows of scaffolding and fences were erected at the construction site for construction isolation and protection, material entry and exit storage, garbage removal, environmental protection, four-port and five-edge protection, construction site fire protection, etc. to achieve safe and civilized construction.
2.4 Provide the management unit (Party A) with relevant construction plan arrangements, plans, on-site construction organization structure, on-site construction management personnel and other information, so as to facilitate the management unit (Party A) to understand the project construction status and fully understand the project construction situation. Supervise construction safety during the process.
2.5 Effectively protect communications, electrical, water supply and drainage and other facilities and equipment. If existing equipment such as communications, electrical, water supply and drainage pipe networks are damaged due to improper construction protection, they must be restored to their original state in a timely manner. Equipment status; causing damage to existing equipment such as telecommunications, electrical, water supply and drainage pipe networks, etc., the equipment management unit must be notified immediately, cooperate with the equipment management unit to repair, and bear all repair costs. Damage to equipment due to improper construction protection will affect normal production (work ), live or cause accidents, bear full responsibility.
2.6 Adhere to civilized construction, strengthen the surrounding environment of construction, the safety protection of pedestrians and vehicles, and the management of construction machinery, tools, and materials. Such as the impact of poor construction management and protection and improper placement and management of machinery, tools, and materials engineering waste Normal production (work), life or accidents caused, bear full responsibility.
2.7 Strengthen the protection and management of life safety of construction workers. If there is a life safety accident caused by poor management or insufficient implementation of protective measures, we shall bear full responsibility.
2.8 Due to project construction, communication, electrical, water supply and drainage pipe network equipment needs to be dismantled and relocated, and relevant procedures must be completed with the equipment management unit in accordance with regulations.
2.9 Actively accept the supervision and inspection of construction safety by the management unit, and rectify the safety problems arising from the inspection within a time limit as required.
2.10 Other responsibilities and obligations: 1. Party B shall actively cooperate with the management party to effectively implement its own safety protection measures and on-site safety protection work to avoid liability accidents.
2. Party B will bear full legal responsibility for safety accidents involving personnel, equipment, vehicles, etc. caused by illegal command and illegal operations.
3. After a safety accident occurs to Party B, the person in charge of Party B shall organize and arrange for rescue and treatment in a timely manner, and shall not make excuses for delays. All costs incurred in the accident will be borne by Party B.
2.11 Party B shall strengthen the management of construction personnel and strictly abide by the relevant provisions of the "Yunnan Province Social Security Comprehensive Management Regulations". During the construction period, no persons unrelated to the project shall be allowed to stay on the construction site. The construction personnel must complete the procedures, and the employed workers must hold ID cards and temporary residence permits, and submit a complete list to Party A, who will then report it to the local police station for filing in order to strengthen management.
2.12 The construction party should do a good job in comprehensive management of fire prevention, theft prevention, explosion prevention and public security at the construction site. Establish and improve various management systems. Fire-fighting equipment should be hung and equipped on the construction site in accordance with Party A's regulations. All types of accidents are strictly prohibited. If the above-mentioned accidents occur, all responsibilities will be borne by the construction unit and Party A will not bear any responsibility.
2.13 The construction team should strengthen the management of the construction site and strictly prohibit idlers and children from entering the construction site. The construction unit will be fully responsible for all accidents caused thereby.
3 Responsibilities and obligations of the management unit
3.1 Supervise the entire construction process involving the safety of personnel, equipment, and vehicles during the construction of this project.
3.2 If the communication, electrical, water supply and drainage pipe networks are damaged due to construction, emergency repairs should be organized in a timely manner to minimize losses and impacts.
3.3 Actively and actively carry out safety supervision, inspection and cooperation, and try our best to provide conditions for project construction.
3.4 The management party (Party A) has the right to educate and punish Party B for potential safety and quality hazards and violations caused by Party B's construction during the construction period, and will give a penalty ranging from 100 yuan to 5,000 yuan depending on the degree of harm. fine.
4. When an accident occurs, it must be reported step by step and must not be concealed.
5. Effectiveness and termination of the agreement
5.1 This agreement will come into effect after being signed and sealed by both parties and submitted to the person in charge of the project department for approval or verification. It will be effective after the project is completed and the relevant expenses are settled. Invalid.
6. For matters not covered in this agreement, both parties can sign a supplementary agreement, which has the same effect as this agreement.
7. This agreement is made in duplicate as an attachment to the subcontract, with Party A and Party B each holding one copy.
Management unit: Party A, China Railway No. 8 Bureau ** Lead Mine Project Department
Signature of the representative:
Person in charge of the Safety and Quality Department of the Project Department:
Year, month and day
Construction unit: Party B Sichuan Changyang Construction Engineering Co., Ltd. (Bai Jixue Construction Team)
Signature of the representative:
Year 6th Construction Project Agreement
×× Construction Engineering Company (Party A)
×× Decoration Design Company (Party B)
In order to give full play to the advantages of both parties Advantages, seeking development, and for the gradual transition to a group company in the future, the two parties have entered into this agreement after full and friendly consultations.
1. Establish a close technical cooperation relationship. From now on, all projects and decoration design tasks undertaken by Party A will be handed over to Party B.
2. Party B guarantees that after receiving the task, it will immediately organize a capable design team led by senior engineers to propose a design plan on the 10th and complete all design drawings within one month after the plan is approved. .
3. In order to ensure the quality of the design, Party A will provide Party B with all required construction technical information without reservation.
IV. The decoration construction team is organized by Party A, and the construction of the decoration project is organized and implemented by Party A. During the construction period, Party B will send senior engineers to supervise the construction to ensure the quality of the project.
5. Party A shall pay the design fee to Party B at × one thousandth of the total cost of the decoration project.
6. This agreement shall take effect from the date of signing.
7. This Agreement is made in duplicate, with each party holding one copy.
Attachment: A copy of "Letter of Intent to Establish XX Construction and Decoration Engineering Group Company".
Party A ×× Construction Engineering Company (seal)
Legal representative: ×× (signature)
Party B ×× Decoration Design Company (seal)
Legal representative: ×× (signature)
××××年×month×日
Party A’s address: ×××××× Party B’s address :××××××
Postal code: ×××××× Postal code: ××××××
Telephone and fax: ×××××× Telephone Also fax: ××××××
Bank account number: ×××× Bank account number: ××××
Contact person: ××× Contact person: ××× Construction Project Agreement Part 7
Party A: Heilongjiang Jinyuan Real Estate Development Co., Ltd.
Party B:
After negotiation between Party A and Party B, Party A agrees to transfer Xiangfang District Meiguan Street shantytown reconstruction project - earthworks, handed over to Party B for construction. We have reached an agreement on cooperation matters as follows:
1. Project Overview:
1. Shantou Renovation Project on Meiguan Street, Xiangfang District
2. Project Location : Section of Meiguan Street, Hacheng Road, Xiangfang District
3. Contract scope: earth excavation project (about 200,000 meters)
2. Determination of unit price of both parties:
Party A and Party B will sign a formal fixed-price construction contract before entering the site for construction. The price of the earthwork shall not be lower than the current market price, or it may be implemented based on a fixed quota.
3. Determination of earthwork volume:
Calculate the earthwork volume according to the foundation pit excavation plan.
IV. Payment method:
For every 30,000 meters of soil excavated, project funds will be allocated once.
5. Deposit and return:
Party B needs to pay a project deposit of 300,000 yuan, which will be returned together with the first earthwork payment when Party B enters the site for construction.
Party A: Party B:
Construction Project Agreement 8
Constructor: (hereinafter referred to as Party A)
Approval of projects based on font size documents. Approved investment of X million yuan d construction area of ??×× square meters. This project has been approved by the County Construction Bureau, and the construction team (hereinafter referred to as Party B) will undertake the construction tasks. In order to clarify the responsibilities, this agreement has been specially formulated after negotiation between both parties, and *** agree to abide by it.
1. Engineering tasks:
1. Project name:
2. Number of projects:
3. Contracting form:
2. Construction period:
1. This project started on month, year, and was completed on day, month, year.
2. The determined dates must be strictly adhered to, and in the spirit of seizing the day, we must create convenient conditions for each other to ensure that the tasks are completed on time. Otherwise, we will handle it as appropriate according to the circumstances.
3. Project price:
1. The total cost of this project is 10,000 yuan.
2. Total budgeted salary in Yuan.
3. All quotas are implemented in accordance with the unified quotas for annual capital construction and installation projects in Shanxi Province.
4. The fee collection standards shall be implemented in accordance with the Jiao Ge Jian Zi Document No.
5. Payment method for salary expenses: Pay in installments according to the progress of the project, settle once after completion and acceptance, and handle payment procedures in accordance with bank regulations.
6. Party B shall pay % of the construction management fee to the County Construction Bureau, which shall be deducted by Party A when making payment and transferred to the Construction Bureau.
IV. Project management and quality acceptance:
1. Party A and Party B will appoint dedicated personnel to form a project quality inspection and acceptance team, which will carry out phased acceptance according to the project progress. If the project does not meet the project quality requirements, it must be reworked in time. After the project is completed, the County Construction Bureau will participate in a comprehensive project acceptance.
2. The national construction acceptance specifications and construction drawings are used as acceptance standards. If there is any violation of the standards, the reasons should be identified and dealt with in a timely manner in accordance with national regulations.
3. If there are major changes during construction, Party A shall notify Party B in advance and complete the change procedures after obtaining the consent of the original planning unit.
4. This project is supervised by comrades from the construction unit and comrades from the construction unit, and both parties cooperate with each other to guide the construction.
5. Safety:
Strengthen safety education and inspection work to prevent accidents and ensure safe construction. In the event of personal injury or death, Party B will be responsible for the expenses. Party A should vigorously assist in solving medical rescue work.
VI. Supply of materials and machinery:
1. Materials should be stacked in appropriate locations, and a certain amount should be reserved before starting construction to ensure that Party B's construction needs are met. If work is suspended to await materials, Party A shall pay Party B all wages during the suspension period (based on average wages).
2. Party B is responsible for large tools, scaffolding, springboards, etc. Small tools and transportation tools are the responsibility of Party B. If Party B has difficulty solving the problem. Party A will provide great assistance.
3. Party A is responsible for the power and water sources required at the construction site. If water and power supplies are insufficient, Party A shall be responsible for arranging other work. Otherwise, Party B’s salary during this period shall be paid by Party A.
7. For matters that cannot be covered by this agreement, please see the supplementary agreement.
8. This agreement will take effect from the date of signature by both parties and approval by the County Construction Bureau.
9. This agreement is made in eight copies, with one copy held by Party A and Party B each, and submitted to the relevant units for reference.
Construction unit:
Person in charge:
Construction unit:
Person in charge:
Year, month, day Construction Project Agreement Part 9
Party A:
Party B:
Party A needs to build a one-story private residential building, and it is now contracted to Party B to undertake the construction. , in order to ensure that the construction can proceed smoothly, after negotiation between Party A and Party B, the specific conditions and construction requirements are signed as follows:
1. Party A builds the main body and decoration of a one-story building with a total area of ??approximately square meters , now
It is contracted by Party B in the form of labor and material contracting. The contracting price is calculated in yuan per square meter, with a total of *** yuan. Party B needs to start from the foundation (including workers breaking piles) based on the projected area. ).
2. Party B must have construction machinery (such as lifts, mixers, vibrators and other machinery and equipment) for construction.
3. Party A is responsible for the building materials, and Party B is responsible for the formwork (note: there must be a second-layer formwork), roofing wood,
Bamboo rows, iron nails, iron wire, Party B is responsible for the tape, safety net, grinding wheel for laying floor tiles and all construction tools and expenses.
4. Party B must pay attention to safety during the construction period. If any accidental casualties occur to workers, Party B will be responsible for all responsibilities and expenses.
5. During the construction period, construction workers must abide by local township regulations and conventions, and Party B is responsible for all expenses such as household registration fees and security fees.
6. Party B will carry out construction according to the design drawings, including the construction of septic tanks (2) and sewers. If there are quality problems that require rework, Party B will be responsible for all material and labor costs.
7. After cement is laid on each floor, no work is allowed on the floor within 2 days. The formwork must be removed 20 days later and must not be removed in advance.
8. The front of the exterior wall of the building should be paved with tiles, and its three sides should be mosaic. The facade on the first floor should be paved with facade tiles. The lobby on the first floor should be paved with terrazzo, and the sidewalks inside the building should be paved.
p>
2.1-meter-high dado tiles, tiles on the edges of the stairs, ceramic tiles on the top of the walls in kitchens and bathrooms, and tiles on the stair walkways
2.1-meter-high dado tiles, on each floor Lay floor tiles and wall tiles in the house
2.1 meters. In the kitchen, a stove must be built and ceramic tiles must be installed. The halls and rooms on the second floor are all covered with 1.5-meter-high wall skirts (each window sill on the second floor needs to jump 30 centimeters).
9. Before cleaning, clean up all the debris in the house before cleaning. After the project is completed, be sure to remove all clutter and keep the room clean.
10. Payment method: Payment is based on the progress of the project, 50% is paid upfront. After the project is completed and passed, the remaining 50% will be paid within three months after acceptance.
十
1. The construction time given by Party A to Party B is from _________year____month____ to _________year____month____ , Party B must complete the construction and hand over the building on time, and will be fined RMB 1,000 for each day of delay.
10.
2. This contract is made in two copies. Each party holds one copy. This shall be the basis and shall not be violated.
Party A’s signature: