Settlement process of photovoltaic subsidy in Ningxia power grid
1. The construction of photovoltaic power station includes site selection, design, equipment procurement, installation and other processes. After the construction is completed, it needs to be connected to the grid to inject the electric energy of the photovoltaic power station into the power grid.

2. The power generation data of photovoltaic power plants need to be monitored in real time, including power generation, power generation and operation status. Monitoring data is collected by monitoring equipment or system and transmitted to the monitoring platform of power grid operators.

3. The owners of photovoltaic power plants need to submit subsidy applications to Ningxia Power Grid or relevant departments in accordance with relevant regulations. The application materials include power station information, power generation data, equipment list, operation and maintenance contract, etc.

4. Ningxia Power Grid or relevant departments will review the subsidy application to verify the authenticity and compliance of the application materials. After the approval, the subsidy will be approved to confirm the amount and duration of the subsidy.